A deficiency in characteristics that render the quality of the material/service unacceptable is usually referred to as:
defective
defect
non-conformance
poor workmanship
lack of fitness for use
A line manager possesses information which the project team needs, but withholds the information. The results in a(n):
Blindspot
Facade
region of influence
Communication power base
A project can best be defined as:
Series of non-related activities designed to accomplish single and multiple objectives.
Coordinated effort of related activities designed to accomplish a goal without a well-established end point.
Cradle-to-grave activities which must be accomplished in less than one year and consumes human and non-human resources.
Any undertaking with a definable time frame, well-defined objectives, and consumes both human and non-human resources with certain constraints.
Guidelines for estimating time durations include:
Assuming a normal level of labor and equipment.
Assuming a normal work week.
Using consistent time units
Using past actual durations as guides.
All or part of each of the above.
Herzberg identified factors which, if present, will lead to increased motivation. A typical factor would be:
Good supervision
Job security
Regular promotions
Good salary
A dental plan
Statistical cost estimating techniques (based upon history), are called _____ estimates and are a _____ approach.
Definitive, bottom up.
Analogy, top down.
Parametric, bottom up.
Parametric, top down.
Analogy, bottom up.
Which quality management tool would be used to determine potential causes of a production problem?
Ishikawa diagram.
scatter diagram.
histogram.
run chart.
Affinity diagrams are used to:
determine if a process is in control.
determine root cause.
show the relationship among variables.
categorize large amounts of data.
One of your project team members has made a technological breakthrough on an R D project. The result will