CNTIC-TEPC-TS-JWZ009-2015锅炉蒸汽吹管调试措施BoilerSteamBlowingCommissioningProcedure.doc

发布:2017-05-24约4.22万字共31页下载文档
文本预览下载声明
2×660 MW SUPER CRITICAL COAL FIRED THERMAL POWER PROJECT NCCPPL, NELLORE, ANDHRA PRADESH (INDIA) 印度纳佳2×660 MW 超临界燃煤热电项目 Boiler Steam Blowing Commissioning Procedure 锅炉蒸汽吹管调试措施 NO.: CNTIC-TEPC-TS-JWZ009-2015 RAV:A PROJECT: 2×660 MW SUPER CRITICAL COAL FIRED THERMAL POWER PROJECT DOCUMENT TITLE: Boiler Steam Blowing Commissioning Procedure DOCUMENT NO. : CNTIC-TEPC-TS-JWZ009-2015 REV. NO. : A ENDORSEMENTS Liu Yunqian REV. NO. DATE DESCRIPTION PREP. BY SIGN.(INITIAL) REVW. BY SIGN.(INITIAL) APPD BY SIGN.(INITIAL) 目录Content 1 工程概况 Project description 1 1.1工程概况Project description 1 1.2锅炉主要设计参数 Boiler design capacity and parameter 1 1.3锅炉给水及蒸汽流程 Boiler feed-water and steam flow 2 1.4蒸汽(水冲洗)吹扫范围the range of steam blowing(water flushing) 2 2编制依据 Basis of Compilation 3 3编制目的 purpose of compilation 3 3组织与分工Organization division 3 4调试前应具备的条件和准备工作Preparations and Conditions before commissioning 5 4.1机务应具备的条件 the condition of mechanical 5 4.2电气、热控应具备的条件the condition of electrical, CI 10 4.3土建应具备的条件 the required condition of civil engineering 11 4.4 其它应具备的条件 the other required conditions 12 4.5作业人员配置、资质The allocation, qualification of commissioning personnel 12 4.6调试所需仪器和设备The equipments and instruments required 12 5调试程序和方法commissioning Procedure and Method 12 5.1吹管方法 steam blowing method 12 5.2吹管系统流程 steam blowing system flow 13 5.3吹管蒸汽参数及吹管系数计算Steam blowing coefficient and calculation of the coefficient 15 5.4吹扫的临时设施 temporary facilities of steam blowing 16 5.5吹管操作步骤 operation step for steam blowing 19 6蒸汽吹管质量标准 the quality standard for steam blowing 25 7安全注意事项 safety caution 26 1 工程概况 Project description 1.1工程概况Project description 印度纳佳2×660MW电站项目工程所采用的锅炉设备是由哈尔滨锅炉厂有限公司制造的型号为HG2000/25.9-YM19超临界锅炉。该锅炉为变压运行、一次中间再热、单炉膛、平衡通风、固态排渣、全钢架悬吊结构、露天布置的π型超临界锅炉,采用不带再循环泵的大气扩容式启动系统,采用四角切圆燃烧方式、低NOx燃烧器,32只燃
显示全部
相似文档