一般刷(喷)浆工程施工工艺标准(936-1996)(General standard of construction technology for brushing (spraying) slurry (936-1996))
Construction preparation:
2.1 material requirements:
2.1.1 block or lime lime powder: used for ordinary brush (spray) pulp project.
2.1.2: big white building materials store products supply, there are square and round points, according to the need to buy.
2.1.3: building materials store silver to match the supply of finished products.
2.1.4: building gypsum building materials store supply, is a rigid gas cementing material.
2.1.5: talcum powder fineness, 140 ~ 325, whiteness is 90%.
2.1.6 adhesive: polyvinyl acetate emulsion, carboxymethyl cellulose, flour, etc..
2.1.7 color: yellow iron oxide, iron oxide red, ultramarine blue, white, green, yellow complex, with strong hiding power, light resistance, alkali resistance, climate impact of various mineral pigments.
2.1.8: General brush lime salt for ordinary white pulp caustic soda, white cement or ordinary cement etc..
2.2 main equipments:
2.2.1 should normally have a hand pump or electric spraying machine, large pulp barrels, small pulp barrels, brush, brush, plastic surgery, rubber scraper, scraper, No. 0 and l, 50 ~ 80 mesh wood sandpaper, wire baskets, slurry tank, the size of the bucket, rubber tube, pliers, wire, putty, groove putty pallets, broom, cloth, cotton yarn etc..
2.3 operating conditions:
2.3.1 indoor plastering work work has been completed, the basic wall should be dry, the moisture content of not greater than 10%.
2.3.2 indoor plumbing, electrical embedded presupposition has been completed, and the completion of pipe hole plastering live repair.
Head over oil 2.3.3 oil industry has been finished.
2.3.4 construction of large area well in advance before the model, by the relevant departments to check the quality of qualified party identification, construction of a large area organized team.
2.3.5 winter construction indoor brush (spray) pulp project should be carried out in the heating condi