建筑流程(Building process)
1) first ready for construction enterprises to participate in the bidding of the full set of valid documents, and then choose their own projects to tender for registration. The tender side to all participating units after the study, obtain reference standard qualifications, pay a deposit to receive drawings, do the project budget. According to the requirements of the tender documents to determine the bid at the same time, in conjunction with the enterprise the Department determined to participate in the project construction management personnel (must have qualification certificates). Preparation of tenders, tenders submitted within the valid time set in the tender documents. Waiting for the opening. (during the best activity, to ensure that the bid to clear the relationship) 2) after the opening as the bid, to communicate with the project, the construction personnel sure, drawings, construction permit, license, notify the project for planning unit positioning line 3) of construction personnel and equipment into play, dig foundation - tank inspection -- Base - - - Acceptance of backfill Basic engineering finish 4) special subject construction -- hanging tree - - - the main completed acceptance after passing into the roof waterproof engineering and interior decoration plastering. On the plumbing, lighting system. The weaknesses of the system. Finally, doors and windows. Cross completed, clean health.5) test -- preliminary - project official notification after passing the acceptance, turnkey 6) do customer service service 7) to do the project accounts for payment (except outside - warranty gold)
Bid: to obtain bid information - bidding registration - to receive bidding documents, construction drawings - bid - bid opening - winning bid
Brick concrete structure construction process: foundation excavation and inspection of foundation subsoil foundation brickwork - ring beams, reinforced concrete, brick - based template - structure - a layer of brick
显示全部