Stage of construction cost control
Construction enterprises in engineering construction of a construction project cost management is the foundation of the enterprise survival and the development and the core of the construction stage does well the cost control to achieve the purpose of increasing earnings is the project activities more important link, this paper will carry on the elaboration to this question, so that in enterprise production and management play a directive role.
So in the project construction cost control what are the content? The author through 10 years of work experience, and analysis has the following aspects:
contract aspects: according to construction drawing, contracting contract as the basis, according to the requirements of the contract project, quality, progress index, compiled in detail the construction organization design, this as the basis of cost plan. The project is in the contract and the existence of the change of component project, report to. As far as possible increases the project income. Use contract rights granted reasonable increase income and reduce expenditure.
technical aspects: first of all, according to the actual situation of construction site, scientific planning of the construction site layout, to reduce the waste and save money to create conditions; Based on its technical superiority, fully mobilize the enthusiasm of management personnel, and carry out the mention reasonable suggestion activities, the expansion of nearly may cost control of scope and depth.
quality and security; In strict accordance with the engineering technical specifications and rules of safe operation management, reduce and eliminate quality and safety accidents, make all sorts of loss is reduced to the minimum.
machinery management: according to the requirements of project scientific, reasonable selection of machinery, give full play to the mechanical performance; Be reasonable arrangement construction in orde