中国石化胜利油田有限公司石油化工总厂 目 录
4
50×10t/a催柴加氢精制装置
给排水及消防施工方案 第1页共 1页
目 录
1.概况1
1.1简述·················································································· 1
1.2特点·················································································· 1
1.3实物量··············································································· 1
2.编制依据 2
3.施工方法及技术要求 3
3.1施工原则和程序···································································3
3.2主要施工方法······································································3
4.质量保证措施 8
4.1质量目标············································································8
4.2质量保证体系······································································8
4.3质量控制点······································································· 10
4.4质量控制点检查表······························································ 11
4.5质量保证措施···································································· 14
5.安全管理及文明施工措施 15
5.1项目部HSE方针································································· 15
5.2项目部HSE管理目标··························································· 15
5.3项目部HSE管理保证体系····················································· 15
5.4安全保证措施···································································· 16
5.5文明施工措施···································································· 17
6.施工进度计划 18
7.劳动力需要安排 19
8.施工机具、计量器具及手段用料20
8.1施工机具一览表································································· 20
8.2计量器具一览表································································· 21
8.3手段用料一览表································································· 22