文档详情

140619 Inlet Construction Monthly Report140619 Inlet Construction Monthly Report.doc

发布:2017-01-02约2.07万字共21页下载文档
文本预览下载声明
青海省引大济湟调水总干渠工程 TBM赶工施工 Qing Hai YDJH Water Diversion Main Line Project Inlet Section TBM Accelerating Construction 施 工 月 报 (201年)编 制 人piled by: 审 核 人: 负责人: 青海引大济湟隧洞工程CMC公司项目部 2014年 21nd , 2014 目 录 1 工程简介 Project Brief Introduction 3 2 工程进度情况 Project Progress Situation 3 3 人力资源投入情况 Human Resources Investment Situation 8 4 现场施工设备投运数量和运行情况及预计进场的施工设备 Input and Transportation Quantity of Construtcion Equipment on the Site, Operation and Predicted Approached Construction Equipment 9 5 主要材料供应情况 Main Material Supplying Situation 11 6 安全生产情况 Safe Production Situation 14 7 工程质量情况 Project Quality Situation 14 8 工程环境保护及文明施工Project Environmental Protection and Civilized Construction 16 工程简介2012年月日,与意大利CMC公司正式签订了《青海省引大济湟调水总干渠引水隧洞》,本协议工作范围包含:实施引水隧洞进口段TBM赶工施工方案的施工生产、生活临建设施;进口段TBM及后配套整修改造;进口段K3+000~K3+040处TBM组装洞室和启动洞段扩挖支护施工;进口段TBM拆卸洞室的扩挖支护施工;进口段TBM洞内组装和拆除;进口段引水隧洞内10公里施工排水系统;进口段3公里已施工引水隧洞段的洞内施工设施;进口段TBM从甘肃省引洮工地运输到青海引大济湟工地;衬砌用管片从引水隧洞出口施工区运输到引水隧洞进口段工地等全部工作内容。。2012年月1日Qing Hai Province Hai Hydraulic and Hydropower (group) Liability co, ltd and Italy CMC Company officially signed the 《Qing Hai Province YDJH Water Diversion Main Line Project Tunnel Accelerating Construction Agreement》. The contract working field includes: Inplementating the construction production and temporary living facilities for the Water Diversion tunnel Outlet section TBM; Renovation and recovery for Inlet TBM and Backup; Expanding excavation and support excavation for TBM Assemby Chamber and Launching Chamber at Inlet section K3+000~K3+040; Expanding excavation and support construction for Inlet TBM Disassemby Chamber; Assembly and disassembly inside TBM Inlet tunnel; 10km’s construction dewatering system in water diversion Inlet section tunnel; Construction facilities for the already excavated 3km inside the water diversion tunnel; The transportation of the Inlet TBM from Gan Su Yin Tao jobsit
显示全部
相似文档