【}商要】以深圳地铁8号线一期工程(莲塘至盐田)为例,根据复杂地质条件的特点,阐述了软硬不均地层及中、微风化岩层中
的盾构掘进和穿越方法,并详细探讨了盾构施工时遇到孤石的应用措施,最终顺利完成了施工:
Abstract【】TakingthefirstphaseprojectofShenzhenmetroline8(fromLiantangtoYantian)asanexample,accordingtothe
characteristicsofcomplexgeologicalconditions,thispaperexpoundsthetunnelingandcrossingmeasuresofshieldtunnelingin
thenon-uniformsoftandhardstrataandinthemileandgentlewindstrata,anddiscussesindetailtheapplicationmeasuresofthe
isolatedstoneencounteredintheshieldtunneling,andfinallytheconstructionissuccessfullycompleted.
【关键词】地铁施工;盾构掘进;复杂地质
Keywords【】subwayconstruction;shieldtunneling;complexgeology
【中图分类号】U231+.3【文献标志码】B【文章编号】1007-9467(2021)05-0121-03
[DOI]10.13616/j.cnki.gcjsysj.2021.05.040
响,深外站至盐田站区间施工难度偏大,纵断面为单向坡,最
1引言
大纵坡2.9%,隧道埋深11〜22m。区间地质具有上软下硬的
随着交通基础设施建设进程逐步推进,地铁成为多数大特点,分布较大范围的微风化层和卵石层,不利于盾构机的
中型城市缓解交通压力的重要途径。纵观地铁工程施工全流顺利推进。
程,盾构施工为重点内容,但碍于地质条件错综复杂的缘故,
3软