合同中英文对照翻译.docx
甲方:XXX乙方:XXX20XXCOUNTRACTCOVER专业合同封面RESUME
甲方:XXX
乙方:XXX
20XX
COUNTRACTCOVER
专业合同封面
RESUME
PERSONAL
合同中英文对照翻译
甲方(采购方):
甲方名称:______
甲方地址:______
甲方联系方式:______
法定代表人(如有):______
乙方(供应方):
乙方名称:______
乙方地址:______
乙方联系方式:______
法定代表人(如有):______
一、MaterialDescription
1.MaterialNameandSpecifications
Material1:Nameis______,specificationsare______(detaileddescriptionsuchassize,model,material,etc.).
Material2(ifany):Nameis______,specificationsare______.
ThematerialsshallmeetnationalrelevantstandardsandspecificengineeringrequirementsofPartyA(suchasfirerating,environmentalprotectionstandards,etc.).
2.QualityRequirements
ThematerialsprovidedPartyBshallhavequalityqualificationdocuments,suchasproductqualificationcertificates,qualityinspectionreports,etc.
Thequalityofthematerialsshallmeetthedesignrequirementsofthenoisecontrolproject,includingbutnotlimitedtonoisereductioneffect,durability,stability,andotherrequirements.
PartyBguaranteesthatthematerialsprovidedwillnotfailordeteriorateinperformanceduetomaterialqualityissueswithin______years(specificduration)fromthedateofdeliveryundernormaloperatingconditions.
二、MaterialQuantityandPrice
1.MaterialQuantity
PartyAsestimatedprocurementquantityofmaterialsisasfollows:
Material1:Quantityis______(unit).
Material2(ifany):Quantityis______(unit).
TheactualprocurementquantityshallbesubjecttoPartyAsfinalwrittennotice,butthenoticeshallbeissued______days(specificduration)beforetheprojectstarts.
2.UnitPriceandTotalPrice
TheunitpriceofMaterial1is______yuan/unit,theunitpriceofMaterial2(ifany)is______yuan/unit.
Thetotalpriceofthematerialsisestimatedtobe______yuan(infull:______),whichiscalculatedbasedontheestimatedquantity.Thefinaltotalpriceshallbesettledbasedontheactualprocurementquantityandc