瀑气风机安装作业指导书讲解.doc

发布:2017-04-18约8千字共19页下载文档
文本预览下载声明
A版次日 期审 核改 版 原 因批 准黄岛电厂2×660MW机组工程编号40XTLSEPCOBSS作 业 指 导 书 #5、6海水脱硫曝气池区 设备管道安装作业指导书 编写/日期: 单位:山东电力建设第二工程公司 锅炉工程处施工技术方案(作业指导书)报审表 表号:DJH-A-06(98版) 编号: 工程名称黄岛电厂三期2×660MW扩建工程合同编号致诚信电力工程项目监理部: 现提出曝气池区安装项目的施工技术方案(作业指导书),请予审批。 附:《#5、6曝气池区设备安装作业指导书》 施工单位(章) 负责人: 年 月 日 项目监理部意见: 项目监理部(章) 总监理师: 年 月 日 监理工程师: 年 月 日目 录 工程概述············································1 施工依据············································1 设备规格、技术参数及部件重量························1 劳力组织及工期安排··································2 施工工器具··········································2 主要施工方案········································2 曝气风机设备安装工序································4 工艺流程、要求及标准································4 安全施工措施········································9 环保注意事项········································11 十一、质量风险分析及防范措施·····························11 十二、安全风险分析及防范措施·····························11 十三、施工管理人员名单···································14 一、工程概述 黄岛电厂三期扩建工程2×660MW机组烟气脱硫工程,每台机组配备两台曝气风机,本工程共四台风机,风机采用并联运行,以便连续向海水曝气池输送氧化空气,风机以曝气池中心线对称布置在海水入口侧。该曝气风机为单级双支承结构,卧式布置。叶轮由一个整体式轴承箱支撑。油站对滑动轴承进行强制供油润滑。风机机壳两端设置了挠性联接件(围带),风机的进气箱的进口和扩压器的出口分别设置了进、排气膨胀节。电动机和风机用两个刚挠性半联轴器和一个中间轴相连接。风机的旋转方向为顺气流方向看逆时针。 经吸收塔吸收SO2后的海水在曝气池中与新的海水混合,曝气处理,使其中不稳定的亚硫酸根被氧化成为稳定的硫酸根,并使海水的PH值与COD等指标恢复到海水水质标准后排入大海。 二、编写依据 1、《曝气风机安装、运行和维护说明书》 2、《曝气池区管道安装图》(北京龙源环保工程公司、北京矿冶研究总院) 3、《电力建设施工及验收技术规范》(锅炉篇) 1996版 4、《火电施工质量检验及评定标准》(锅炉篇) 1996版 5、《电力建设安全工作规程》(火力发电厂部分) 6、《施工组织总设计》 7、《锅炉脱硫专业施工组织总设计》 三、设备规格、技术参数及部件重量 1、瀑气风机的型号:D1590-11 2、曝气风机的设计参数: 主轴转速:2980r/min 进口流量:1590 m3/min 风机升压:32KPa 进口
显示全部
相似文档