文档详情

- CONTRACT FOR PROJECT INSTALLATION.doc

发布:2017-01-10约2.76万字共75页下载文档
文本预览下载声明
CONTRACT FOR PROJECT INSTALLATION   This Contract for project of installing Main Engine is made on_________, by and between _________ Company Ltd. (here- inafter called Party A) and _________ Company Ltd. (hereinaftercalled Party B).   1.Name of installation work: _________.   2.Location of installation work: Party A#39;s_________in Port A.   3.Scope of installation work: As specified in the drawingsand statement attached.   4.Time limit for completion:   The installation work shall cordinate with the construction of _________ in Party A, and shall be completed, including thetrial run for _________, within _________days after the completion of _________.   5.Total price of installation work:_________U.S. D only.   6.Payment terms of installation work:   First installment:   Party A shall pay to Party B fifteen percent of the total pricefor installation work, i.e._________U.S.D only, when thiscontract comes into effect.   Second installment:   Party A shall pay to Party B fifteen percent of the total pricefor instalatiorn work, i.e_________U. S. D. only, at the commencement of construction installation.   Third installment:   Party A shall pay to Party B ten percent of the total pricefor installation work, i.e._________U. S. D. only, duringthe installation of pipes.   Fourth installment:   Party A shall pay to Party B forty percent of the total pricefor installation work, i.e._________U. S. D. only, at thetime when the main equipment arrives at the site.   Fifth installment:   Party A shall pay to Party B ten percent of the total pricefor installation work,i.e._________U. S. D. only, upon comple - tion of the installation work.   Sixth installment:   Party A shall pay to Party B ten percent of the difference of the price for installation work, i.e._________U. S. D. only, after the work received has been proved qualified.   7.Penalty for default:   In the e
显示全部
相似文档