年高考试题全国卷II语文试题与答案.doc
文本预览下载声明
2006年高考试题全国卷II语文试题与答案
时间:2006年06月08日22:40 我来说两句(527)
? 精彩世界杯 精彩进球视频
Sohu 教育频道 考场纵横 2005高考站 2005高考试题及答案
2005年高考·全国卷一 理科综合
LEARNING.SOHU.COM ?? 2005年6月8日23:28 ? ?来源:[ 天星教育网 ]?
页面功能【我来说两句((4))】【 收藏本文】【热点排行】?【推荐】【字体:大?中?小】【打印】【关闭】
project design. Construction preparation phase and construction tender approval for project administration procedures project site level. Project implementation schedule in Figure 2, the implementation of control measures (a ...7、Tender procedures (a) invites tenders for the project in accordance with the relevant provisions of the State to comply with the project approval procedure, after obtaining the approval of public tenders. Publish tender notices tender specified media. Notice shall set forth the name and address of the tenderer, the nature, quantity, implementation of the project location and the times and ways to obtain tender documents and other items. This item should include the tender project of technical requirements, bidder eligibility criteria, bid requirements and evaluation standards of all substantive requirements and intends to sign the contracts terms and conditions. (B) investigation and design bidding is the entire basis of the project of investigation and design work. Public tender of project design, public choice of investigation and design units, the project design is building professional grade b or above qualification of bidders. (C) quality of tendering and construction supervision for engineering construction supervision plays a key role. At the time of construction supervision of tendering and public supervision of project construction management enterprises. This project require bidders to have construction engineering grade b or above qualification. (D) the construction Enterprise bidding engineering needs require bidders to have construction grade or above qualification. (E) main material procurement according to the projects needs, public choice major ma
显示全部