排水课程设计计算说明书.doc
文本预览下载声明
排水设计计算说明书
学院:环境科学与工程学院
专业:给水排水工程专业
级别: 200 级
指导教师:
姓 名:
学 号:
时 间:200 年6月1
目录
Ⅰ. 排水管道工程课程设计任务书······································2
一.基本资料·····················································2
二.设计依据·····················································3
三.排水管网设计任务 ············································3
Ⅱ. 污水管道设计计算说明···········································4
一.划分排水流域及管道定线·······································4
二.确定污水管道设计流量·········································4
(1)居民区污水设计流量···········································4
(2)工业区污水设计流量···········································5
(3)比流量计算··················································5
(4)管段设计流量················································5
三.污水管道水力计算·············································8
四.成果图绘制···················································9
Ⅲ. 雨水管道设计计算说明···········································10
一.划分排水流域及管道定线······································10
二.主要设计参数················································11
(1)暴雨强度公式···············································11
(2)地面径流和径流系数··········································11
(3)折减系数··················································12
三.雨水管道水力计算············································12
四.成果图绘制··················································13
Ⅳ. 附表
一.污水管网管线水力计算表······································14
二.雨水管网管线水力计算表······································16
排水管道工程课程设计任务书
一、基本资料
1、 ZQ镇规划面积平面图1张。
2、地理位置及地形特点:ZQ镇位于浙江省宁波市境内,规划杭州湾高速公路的东侧,329国道贯穿南北。规划用地面积2.16 km2。全镇地势北高南低,西高东低,海拔在4.5~6.5 m之间。
3、规划中该镇由329国道分为南北两区,南面为居民生活区,北面为工业区。居民区人口密度为200人/ hm2,建筑多为2~3层,最高为6层;规划工业区主要为电器、精密机械制造业,在计算用水量时,可折合人口密度为100人/ hm2,按照居民区的计算方式进行,最低服务水头要求为20 m。
4、气温:ZQ镇位于北亚热带南缘,属季风型气候。冬夏稍长,春秋略短。温暖湿润,气温变幅小。年平均气温16.1℃,1月平均气温最低,历年平均4.0℃,7月平均气温最高,历年平均28.2℃,极端最低气温-9.3℃,极端最高气温39.1℃。冰冻线深度0.6 m。
5、降雨:年平均降水量(含雨、雪、冰雹)1259.6mm,年降水量少于1000mm的少水年占15%,大于1500mm的丰水年占17.6%。平均10年中有大旱、大涝各一年。降水量年内分配不均匀,春雨、梅雨、秋雨与伏旱、秋冬旱交替,降水最高峰在9月,平均172.4mm,占全年的14%,最高曾
显示全部