斜拉桥ansys建模
/com,new model of linjiang cable_stayed bridge,2004.2.09
/prep7
/title, cable_stayed bridge,author is Sunhang
/com,define the keypoints
*set,alfa1,10 !angle of tower upside
*set,alfa2,65 !angle of tower downside
*set,alfa3,79.04594 !angle of tower with bridge surface
*set,y1,55.5 !桥塔顶面到原点的距离
*set,y2,33.5 !桥塔中部的Y轴向长度
*set,pi,3.1415926
*set,x3,y2/tan(alfa2*pi/180) !桥塔中部的X轴向长度
*set,x2,(y1-y2)*tan(alfa1*pi/180) !桥塔上部的X轴向长度
*set,x1,x2+x3 !桥塔的X轴向长度
*set,kp_yy1,0 !定义桥塔上部的索锚固点竖向距离(从塔顶算起)
*set,kp_yy2,2.5185
*set,kp_yy3,3.5788
*set,kp_yy4,4.6469
*set,kp_yy5,5.7248
*set,kp_yy6,6.8151
*set,kp_yy7,7.9211
*set,kp_yy8,9.0479
*set,kp_yy9,10.2027
*set,kp_yy10,11.3965
*set,kp_yy11,12.6470
*set,kp_yy12,13.9848
*set,kp_yy13,15.7143
*set,kp_yy14,17.7041
*set,kp_yy15,22.0000
k,1,-x1,y1,
k,6,-x1+kp_yy2*tan(alfa1*pi/180),y1-kp_yy2
k,8,-x1+kp_yy3*tan(alfa1*pi/180),y1-kp_yy3
k,10,-x1+kp_yy4*tan(alfa1*pi/180),y1-kp_yy4
k,12,-x1+kp_yy5*tan(alfa1*pi/180),y1-kp_yy5
k,14,-x1+kp_yy6*tan(alfa1*pi/180),y1-kp_yy6
k,16,-x1+kp_yy7*tan(alfa1*pi/180),y1-kp_yy7
k,18,-x1+kp_yy8*tan(alfa1*pi/180),y1-kp_yy8
k,20,-x1+kp_yy9*tan(alfa1*pi/180),y1-kp_yy9
k,22,-x1+kp_yy10*tan(alfa1*pi/180),y1-kp_yy10
k,24,-x1+kp_yy11*tan(alfa1*pi/180),y1-kp_yy11
k,26,-x1+kp_yy12*tan(alfa1*pi/180),y1-kp_yy12
k,28,-x1+kp_yy13*tan(alfa1*pi/180),y1-kp_yy13
k,30,-x1+kp_yy14*tan(alfa1*pi/180),y1-kp_yy14
k,38,-x1+kp_yy15*tan(alfa1*pi/180),y1-kp_yy15
kfill,1,6 !在已建关键点内内插关键点
kfill,6,8
kfill,8,10
kfill,10,12
kfill,12,14
kfill,14,16
kfill,16,18
kfill,18,20
kfill,20,22
kfill,22,24
kfill,24,26
kfill,26,28
kfill,28,30
kfill,30,38
*set,kp_numone,38!定义桥塔上部的最后一个关键点号
/com,define and mesh the above part of tower
*dim,BBS,,40
*dim,HHS,,40
*dim,SSS,,40
*dim,IIYYS,,40
*dim,IIZZS,,40
*set,length1,2.9546108
*set,length2,4.9251168
*set,width1,3
*set,width2,5
*set,diff1_length,length2-length1 !桥塔上部两个截面的长度之差(纵桥向)
*set,diff1_