The first section of the raw material management system
A raw material, work must strictly implement the production plan, the billet according to the standard of procedures technology of steel billet technology conditions or the company issued to billet inspection and acceptance.
Two, in the raw material receiving billet, steel to transfer small ticket check every car (including the billet furnace number, grade, quantity) is accurate, and check and acceptance of the quality of steel billet, does not meet the standards of the timely pick or return the car.
Three, steel billet transfer ticket not lost, the monthly summary binding, safekeeping, as billet settlement vouchers.
Four, material, raw material member must pass North netput billet, smelting, to check the relevant information into the furnace and billet (including grades and component etc.) is in accordance with the corresponding plan confirmation before entering the furnace, or are not allowed into the furnace.
Checks a five member of each class of raw material, cold billet length, section size, such as the discovery of the billet shape and size deviation and timely feedback to the production area and the dispatch room.
Six, raw material stacking requirements tidy and standard; different kinds of steel billet must set stack, not allowed to mix, and set the mark; the unqualified billet must strictly distinguish, and set the mark.
Seven, raw materials industry must implement the feeding system by steel furnace, smelting and rolling, the correct reflection of the conversion, and fill out the feeding records.
Eight, in the 1 hours of raw materials into the furnace after the billet, online information timely and accurately, ensure the follow-up information transfer.
Nine, raw materials must keep abreast of the quality of steel material library and inventory information.
Ten, other matters according to the relevant provisions of the procedures technology implementation.