based simulation architecture for evaluating operational policies in transhipping container.pdf
文本预览下载声明
K. Fischer et al. (Eds.): MATES 2006, LNAI 4196, pp. 73 – 85, 2006.
? Springer-Verlag Berlin Heidelberg 2006
Agent Based Simulation Architecture for Evaluating
Operational Policies in Transshipping Containers
Lawrence Henesey, Paul Davidsson, and Jan A. Persson
Department of Systems and Software Engineering, Blekinge Institute of Technology.
Box 214, Karlshamn, Sweden
{lhe, pdv, jps}@bth.se
Abstract. An agent based simulator for evaluating operational policies in the
transshipment of containers in a container terminal is described. The simulation
tool, called SimPort, is a decentralized approach to simulating managers and
entities in a container terminal. We use real data from a container terminal, for
evaluating eight transshipment policies. The simulation results indicate that
good choices of yard stacking and berthing position polices can lead to faster
ship turn-around times, for instance, the Overall Time Shortening policy offers
a lower cost and when combined with a Shortest Job First sequencing of arriv-
ing ships on average yielded a faster ship turn around time. The results also
indicated, with respect to the studied performance measures that Stacking by
Destination is a good choice of policy.
1 Introduction
The growth in the use of containers for transporting goods has been profound from 39
million containers handled in 1980 to over 356 million in 2004 and the annual growth
rate is projected at 10 percent till 2020 [1]. Parallel with the increasing demands for
transporting cargo in containers is the increasing importance in improving container
terminal (CT) operations. As the primary function of CTs is to provide for efficient,
low-cost, inter- and intramodal transfer, inspection, storage, form change, and control
of cargo, the CT must be able to effectively act as an integral part of transport chain
from origin to destination [2]. According to Frankel [2], port costs can be in excess of
50 percent of the total costs of w
显示全部