文档详情

龙门架施工组织设计方案.doc

发布:2017-10-24约6.87千字共33页下载文档
文本预览下载声明
××××××××龙门架设施工程 《施工组织设计方案》 ×××××××有限公司 ×××年××月××日 目 录 一、 工程概述······················································································3 二、 编制依据及执行标准····································································3 三、 工程施工方案···············································································4 四、 工程质量控制目标······································································施工进度计划···················································································································································10 七、 主要劳动力计划···································································11 八、 物资配备计划·············································································12 九、 龙门架立柱基坑的施·······························································13 十、 龙门架的制作·············································································?龙门架的安装·················································································································································20 十三、 安全文明施工措施····································································24 十四、 工程质量保证措施·····································································27 十五、 应急处理预案············································································29 《施工组织设计方案》 工程概述: 1. 施工项目:×××××××××××××××××龙门架设施安装工程。为配合南大干线工程(番禺大道节点立交)通信管线临迁工程建设,需在道路人行道及绿化带临时占用开挖建设龙门架。龙门架建成后,××××××××××的弱电管线将临时架设在龙门架上。待未来××××道路施工,弱电管线随道路施工永迁下地,龙门架将被拆除。龙门架预计占用道路时间自竣工起约×年。 2. 工程地点及结构概况: 2.1××××××路设×座跨度××米,净空高度××米门架; 2.2××××××路设×座跨度分别是××米和××米,净空高度××米门架; 2.3××××××路设×座跨度分别是××米和××米,净空高度××米门架。 3. 工期要求:计划××××年××月××日开工,××××年××月××日竣工,总工期××个日历天。 4. 工程范围:按业主方招标文件工程量清单及对应施工图纸上涵盖的所有门架设施工作内容,本工程施工范围包括的现场现场安装施工。钢结构焊接规范(钢结构工程施工规范?GB 50755-2012); 以及工程执行的现行国家、地方颁布的标准规范、规程及相关政策法规。 三、工程施工方案: 1. 施工准备 ??? 2. 组织有关工程管理和技术人员对设计图纸进行会审。对图纸不明确及施工中有困难的地方,要与设计单位作好变更鉴证手续 ??? 3. 根据施工图纸结合本单位的设备和技术条件,制定出工程的施工方案,并提出材料计划 ?? ?4. 对工程所使用的机械和检测设备的性能进行检验,保证施工过程中各种设备的工作状态良好,使用功能齐全 ???5
显示全部
相似文档