【摘要】结合工程实例,分析了土压平衡顶管施工时的管道埋深对道路路基的影响及顶管下穿道路时的沉降量,并就土压平衡顶
管施工下穿市政主干道的施工技术要点展开了详细的研究,以保证城市主干道周围建筑及设施安全,减少顶管施工对主干道交通
的干扰,提高顶管施工效率。
Abstract】Combinedwithengineeringexamples,theinfluenceofpipeburieddepthonroadsubgradeandthesettlementwhenpipejacking
【
passesthroughroadundersoilpressurebalanceconstructionaredeeplyanalyzed,andthekeypointsofconstructiontechnologyofthemunicipal
mainroadundersoilpressurebalancepipejackingconstructionarestudiedindetail,soastoensurethesafetyofbuildingsandfacilitiesaround
themainroad,reducetheinterferenceofpipejackingconstructiononthemainroadtraffic,andimprovetheefficiencyofpipejackingconstruction.
【关键词】市政道路;土压平衡顶管;施工技术
【Keywords】municipalroad;soilpressurebalancepipejacking;constructiontechnology
【中图分类号】TU990.3【文献标志码】B【文章编号】1007-9467(2024)01-0143-03
【DOI】10.13616/j.cnki.gcjsysj.2024.01.244
1引言3路基工作区的影响
顶管施工技术由于其工程造价低、施工便捷、对施工周围该雨水管道铺设施工中,由于采用的是顶管施工技术,要
影响范围小等优被广泛应用于各类管道铺设工程中与传保证正常的交通运行,所以事先设计的铺设雨水管道的施工
统开挖式管道铺设技术相比,顶管技术在不用大面积开挖地