河道综合治理工程施工方案--第1页

河北建设集团有限公司

马鞍山博望新区中心湖水系综合治理工程

(高潮河综合治理G2+900—G3+700段)

施工组织设计

编制:

审核:

批准:

河北省建设集团有限公司

河道综合治理工程施工方案--第1页

河道综合治理工程施工方案--第2页

河北建设集团有限公司

目录

第一章施工组织设计总说明·······················································································1

1.1工程概况··········································································································1

1.3对工程难点、技术关键点的认识与理解··································································2

第二章整体规划········································································································9

2.1编制依据·········································································································9

2.2管理目标······································································································10·

2.3组织机构及职能·····························································································11·

第三章现场布置···································································································15·

3.1施工总平面布置说明·······················································································15·

3.2施工道路······································································································15·

3.3施工供电······································································································16·

3.4施工供水······································································································16·

3.5施工照明·························································