化学专业——毕业论文——5000立方米╱天生活污水处理厂的工艺设计.doc
文本预览下载声明
九江学院化学化工学院本科论文
- PAGE 2 -
摘 要
本次毕业设计的题目为5000立方米/天生活污水处理厂的工艺设计。主要任务是工艺流程选择及构筑物设计和计算。
其中初步设计要完成设计说明书一份、污水处理厂流程图一张,曝气沉砂池图一张,氧化沟图一张,二沉池图一张。
该污水处理厂工程,总规模达到5000吨/日。该污水厂的污水处理流程为:从泵房到沉砂池,进入氧化沟,二沉池,最后出水;污泥的流程为:从二沉池排出的剩余污泥首先进入浓缩池,进行污泥浓缩,然后进入污泥脱水车间进一步脱水后,运至垃圾填埋场。
出水执行国家污水综合排放标准(GB8978-1996)二级标准。
关键词:卡鲁塞尔氧化沟;生活污水处理;工艺设计
关键词:卡鲁塞尔氧化沟;生活污水处理;工艺设计
Abstract This graduation projects topic is 5000 cubic meter/day of sanitary sewage treatment plant technological design.The primary mission is the technical process choice and the construction design and the computation.
And the preliminary design must complete design instruction booklet one, Sewage treatment plant flow chart, aeration sand collector chart, oxidation ditch chart, two sink pond chart.
This Sewage treatment plant project, the overall scale amounts to 5000 tons/days.This sewage factorys sewage treatment flow is: From the pump house to the sand collector, enters the oxidation ditch, two sink the pond, finally water leakage; The sludge flow is: From two sink the excess sludge which the pond discharges first to enter the concentration basin, carries on the sludge thickening, after then enters the sludge dewatering workshop further dehydrates, transports to trash fills in buries the field.
Water leakage execution country sewage synthesis emission standard (GB8978-1996) two levels of standards.
Key Words:Carew Sayre oxidation ditch;effluent treatment;process design
目 录
TOC \o 1-3 \h \z 摘 要 1
Abstract 2
引 言 1
1设计任务的概述 2
1.1排水水量、水质及排放标准 2
1.2处理出水水质标准 2
2污水处理工艺方案选择 3
2.1设计原则 3
2.2工艺方案分析 3
2.3工艺流程确定 7
3污水处理工艺设计计算 9
3.1水质水量的确定 9
3.2格栅 9
3.2.1粗格栅设计 9
3.2.2污水提升泵房的设计 10
3.2.3细格栅的计算 11
3.3曝气沉沙池 13
3.3.1设计说明 13
3.3.2曝气沉沙池的的设计与计算 14
3.3.3水面标高 17
3.3.4配水井的计算 17
3.4氧化沟 18
3.4.1设计说明 18
3.4.2设计计算 18
3.5辐流式二沉池 21
3.5.1设计说明 21
3.5.2设计计算 22
3.6管道设计及布置 24
3.6.1进水管、事故管 24
3.6.2污水管 25
3.6.3污泥管 26
3.7高程布置 28
3.7.1布置原则 28
3.7.2建筑物的水头损失 28
3.7.3注意事项 29
3.7.4计算表 30
显示全部