APC NetworkAIR FM Sub-base Installation (Sheet)说明书用户手册.pdf
文本预览下载声明
Sub-Base Installation
Tools required—not provided
Standard screwdriver Level Drill
When determining the location of the sub-base, consider the following:
• Availability of a level floor that can support the weight of the Module
• Location of utilities
To provide access to the mounting holes and utilities, remove the front and/or rear
panel by unlocking the two ¼-turn fasteners located on each panel.
To install the sub-base. Mount the sub-base to the floor using six lag-bolts (not provided) or other
code-compliant approved fasteners. Shims may be used in areas where the floor is uneven.
990-2142 *990-2142* 02/2005
显示全部