隧道穿越活动性断层处置技术的探讨_谷柏森.pdf
文本预览下载声明
第12卷第4期 现代交通技术 Vol. 12 No.4
2015年8月 Modern Transportation Technology Aug. 2015
隧道穿越活动性断层处置技术的探讨
谷柏森,吴 行,韩光钦
(苏交科集团股份有限公司,江苏 南京 210017)
摘 要:在地下工程建设中,特别对于山区公路隧道,活动性断层的影响和破坏程度比其他类型工程更加明显。文章结
合目前国内外应对隧道穿越活动性断层的主流研究思路,以某山区公路隧道为例,尝试提出一种具体可实施的综合处
理措施,通过洞身超挖、衬砌节段设计、节段间柔性连接设计以及剪切缝设计等多种设计相结合,以保证隧道顺利通过
断层影响带,满足隧道运营期间的安全性和耐久性要求。
关键词:隧道;活动性断层;衬砌节段;剪切缝
中图分类号:U452.2 文献标识码:B 文章编号:1672–9889(2015)04–0064–04
Probe into Disposal Technology of Highway Tunnel Across Active Fault
Gu Baisen,Wu Hang,Han Guangqin
(JSTI Group, Nanjing 210017, China)
Abstract: As for the underground construction projects, especially for highway tunnel, the impact and extent of the damage
active faults was more obvious than other types of projects. Combining with the current domestic and international research
ideas response to tunnel through the active faults of the mainstream, this paper put forward a specific actionable comprehensive
treatment for a highway tunnel. It combined a variety of designs including the over-excavation of tunnel trunk, lining section
design, segmental flexible connection design and etc, so that the tunnel could pass the fault zone smoothly and meet safety and
durability requirements during tunnel operation.
Key words: tunnel; active faults; lining section; cutting deformation joint
1 概述 四川绵茂公路某拟建隧道隧址区分布有活动性
断层,断层错动影响带将对该隧道产生不利影响。本
活动性断层具有特殊的活动性和不稳定性,对
文基于该隧道工程探讨处理隧道跨活动断裂带的工
隧道结构的破坏可分为两种基
显示全部