文档详情

小水电保险方案.doc

发布:2017-06-22约2.13万字共16页下载文档
文本预览下载声明
小水电工程项目 安装工程一切险 保险经纪有限公司 年 月 日 CONTRACTOR’S ALL RISKS Policy Form: Based on Standard Munich Re Policy and Following endorsements Original Insured Section I II Employer/Owner: (b)EPC Contractor:(c)The sub-contractors and sub-suppliers of any tier() ()Project Financiers )any Operator, Licensor/Licensee, Franchisor/Franchisee and/or Manager with whom Employer/Owner has entered or will be entering into agreements(s) or contract(s) in connection with the Project; All for their respective rights and interest. Insured Project Sisira hydropower plant Project Location Period of Insurance Construction/Erection Period: Within about 650 days from the date to be advised including testing and commissioning of 2 months. Any extensions of the Period of Insurance are automatically held covered up to 6 months without additional premium; any further extension should be charged by an additional premium of no greater than pro-rata premium. Plus 12 months extended Maintenance / Defects Liability period. Maintenance or Defects Liability Period commence from the date of the Completion of the Project. Completion of the Project means the handover of all property (after acceptance by the Employer according related conditions in the related contract unless otherwise determined by the Employer) of the Project from Contractors to Employers. Interest Insured Section I – Material Damage Construction/Erection works: All permanent and temporary works, temporary buildings, materials, spares, machinery and equipment, office equipment, tools, and all other property or equipment of whatsoever nature or description, the property of the Insured or that for which they are responsible at the site or elsewhere within the Territorial Limits including whilst in transit or temporarily stored at or away from the site all in connection with the project work. Contractor’s Plant and Equipment Section II – Third Party Liability To cover legal liability arising out of the performance of the pro
显示全部
相似文档