文档详情

工程进度时间管理.doc

发布:2017-06-19约9.58万字共10页下载文档
文本预览下载声明
HYPERLINK /10.1016/j.autcon.2015.07.004AutomationHYPERLINK /10.1016/j.autcon.2015.07.004 inHYPERLINK /10.1016/j.autcon.2015.07.004 ConstructionHYPERLINK /10.1016/j.autcon.2015.07.004 58HYPERLINK /10.1016/j.autcon.2015.07.004 (2015)HYPERLINK /10.1016/j.autcon.2015.07.004 38HYPERLINK /10.1016/j.autcon.2015.07.004–HYPERLINK /10.1016/j.autcon.2015.07.00447 Contents lists available atHYPERLINK /science/journal ScienceDirect Automation in Construction journal homepage: /locate/autcon Real time progress management: Re-engineering processes for cloud-based BIM in construction Jane Matthews a, Peter E.D. Love b,?, Sam Heinemann a, Robert Chandler c, Chris Rumsey c, Oluwole Olatunj a a b c Department of Construction Management, Curtin University, GPO Box U1985, Perth, WA 6845, Australia Department of Civil Engineering, Curtin University, GPO Box U1985, Perth, WA 6845, Australia Aquenta Consulting, 8/197 St Georges Terrace, Perth, WA 6000, Australia a r t i c l e  i n f o  a b s t r a c t Article history: Received 14 February 2015 Received in revised form 13 May 2015 Accepted 11 July 2015 Available online 28 July 2015 Keywords: BIM Real-time monitoring Checklists清单 RC structure Object orientated work flows 1. Introduction  Having timely access to information on the performance of a construction project enables the design team and contractor to improve their decision-making so as to ensure project deliverables确保工程如期交付 are met. This paper examines the effectiveness of cloud-based BIM for real-time delivery of information to support progress monitoring and management of the construction of a reinforced concrete (RC) structure using action based research. To under- take this task, existing paper-based processes were re-engineered to accommodate the use of cloud-based BIM during construction. The design and implementation of a real-time object oriented bi-directional system, allowed information (e.g., the status of the ‘As-Built’竣工 sc
显示全部
相似文档