HYPERLINK /10.1016/j.autcon.2015.07.004AutomationHYPERLINK /10.1016/j.autcon.2015.07.004 inHYPERLINK /10.1016/j.autcon.2015.07.004 ConstructionHYPERLINK /10.1016/j.autcon.2015.07.004 58HYPERLINK /10.1016/j.autcon.2015.07.004 (2015)HYPERLINK /10.1016/j.autcon.2015.07.004 38HYPERLINK /10.1016/j.autcon.2015.07.004–HYPERLINK /10.1016/j.autcon.2015.07.00447
Contents lists available atHYPERLINK /science/journal ScienceDirect
Automation in Construction
journal homepage: /locate/autcon
Real time progress management: Re-engineering processes for
cloud-based BIM in construction
Jane Matthews a, Peter E.D. Love b,?, Sam Heinemann a, Robert Chandler c, Chris Rumsey c, Oluwole Olatunj a
a
b
c
Department of Construction Management, Curtin University, GPO Box U1985, Perth, WA 6845, Australia
Department of Civil Engineering, Curtin University, GPO Box U1985, Perth, WA 6845, Australia
Aquenta Consulting, 8/197 St Georges Terrace, Perth, WA 6000, Australia
a r t i c l e
i n f o
a b s t r a c t
Article history:
Received 14 February 2015
Received in revised form 13 May 2015
Accepted 11 July 2015
Available online 28 July 2015
Keywords:
BIM
Real-time monitoring
Checklists清单
RC structure
Object orientated work flows
1. Introduction
Having timely access to information on the performance of a construction project enables the design team and
contractor to improve their decision-making so as to ensure project deliverables确保工程如期交付
are met. This paper examines
the effectiveness of cloud-based BIM for real-time delivery of information to support progress monitoring and
management of the construction of a reinforced concrete (RC) structure using action based research. To under-
take this task, existing paper-based processes were re-engineered to accommodate the use of cloud-based BIM
during construction. The design and implementation of a real-time object oriented bi-directional system, allowed
information (e.g., the status of the ‘As-Built’竣工 sc