文档详情

克莱德输送技术在铜镍业的应用分析.ppt

发布:2017-06-13约1.73万字共63页下载文档
文本预览下载声明
Materials Handling Technology for the Copper Industry 物料输送技术在铜业中的应用 A customer’s viewpoint客户寄语 “The Clyde system has operated very well and we are obtaining some real process benefits in terms of throughput. 克莱德公司的物料输送系统运行的非常好,提高了系统的生产能力,给客户创造了很好的效益。 The equipment has proved very reliable and has significantly reduced plant downtime 实践证明,该公司提供的设备非常可靠,大大降低了车间的停工时间。 The Clyde organisation has provided excellent support both during the project implementation and since. We wish other suppliers were the same” 无论是在项目执行期间,还是执行完毕以后 ,克莱德公司都给我们提供了极好的支持。我们祝愿其他设备供应商也能做到这样。 Fernando Rojas – Smelter Manager 冶炼厂厂长 Codelco – Division Codelco Norte Primary Copper Applications应用 Primary Copper Applications应用 Technologies applications 技术与应用 Reference project list 案例与项目清单 Boliden--瑞典 2000 – Sweden - Dry charge / Metallurgical Dust Transport System Codelco--智利 干料加料系统/冶金粉尘输送系统 2000 - Division Codelco Norte, Chile - Metallurgical Dust Transport 冶金粉尘输送系统 2001 - Division El Teniente, Chile - Carbon Injection System 喷碳系统 2002 - Division Codelco Norte, Chile - Copper Concentrate Injection Systems 铜精矿喷吹系统 2003 - Division El Teniente, Chile - Metallurgical Dust Transport System 冶金粉尘输送系统 2004 - Division Codelco Norte, Chile - Copper Concentrate/Flux Transport 铜精矿/助熔剂输送系统 2004 - Division El Teniente, Chile - Copper ConcentrateTransport / Injection Systems 铜精矿输送系统与喷吹系统 Nord Deutsche Affinerie--德国 2004 – Germany - Scrap injection system 废料喷吹系统 Curtain feeding of Copper Concentrate to smelting furnace 炼铜炉帘式加料系统 CMH, System under development, 2004 2004年CMH正在开发的系统 Overview 概述 Challenge 开发目的 Increase smelter throughput and availability 增加熔炉的产量与效率 Reduce costs of running ‘oversize’ ancillary systems 降低目前庞大的辅助系统的运行成本 Improve stability of reaction processe
显示全部
相似文档