临时用电安全技术档案
机械维修保养记录
工程名称:
工程地址:
机 电 工:
机电工证号:
证件有效期:
起止日期:
目 录
机电工安全技术”交底书·····································1
建筑施工现场“安全生产六大纪律”···························2
工种安全操作规程 ·········································3
施工机械安全操作规程······································4
施工现场临时用电安全技术规范······························7
“十不焊割”规定···········································8
施工机械完好技术标准······································9
临时用电安全技术档案·····································11
建筑施工现场临时用电施工组织设计·························12
建筑施工现场临时用电施工组织设计变更表···················13
建筑施工现场临时用电技术交底记录························14
建筑施工现场临时用电验收表······························15
建筑施工现场临时用电设备调试记录························16
建筑施工现场临时用电绝缘电阻测试记录····················33
建筑施工现场临时用电接地电阻测试记录····················34
建筑施工现场临时用电检查记录····························35
建筑施工现场临时用电复查验收表··························36
建筑施工现场临时用电安装维修拆除工作记录················56
建筑施工现场临时用电漏电保护器测试记录··················62
电工巡视维修工作记录卡··································63
设施维修保养记录及验收表······························65
参考资料··············································75
机电工安全技术交底书
工程名称
施工地点
工作单位
工 号
证 号
证件有效期
作业内容
施工期限
交底内容:
电工必须经国家专业部门培训合格后方可持证上岗,证件每两年复审一次,每六年换证 一次,必须保证长期有效。
电工必须认真学习并掌握现行JGJ46-2005《施工现场临时用电安全技术规范》和JGJ59-99《建筑施工安全检查评分标准》,并认真遵照执行。
机电工必须按照本交底书中要求操作并认真填写各项表格。
机电工必须熟读并掌握现场机械设备说明书中的相关要求,做到“三懂、四会”,即“懂原理、懂构造、懂性能”;会“使用、会排除故障、会维修,会保养”。
机电工必须在机械设备拨离施工现场前,及时维修保养好,使其保证完好状态,不得延误调拨时间。
本手册必须仔细阅读,认真填写,妥善保管,在工程结束后必须上缴公司设备管理部存档。
机电电工责任认定及处罚条例(企业试用版)
机电工工作的内容:
= 1 \* alphabetic a、负责现场临时用电工作。 = 2 \* alphabetic b、负责现场机电设备的检查、维修、保养工作。 = 3 \* alphabetic c、负责现场零星的电焊工作(限有电焊工证的机电工),以上为机电工的本职工作内容。如机电工明知影响本职工作,但不向指挥做其它不相关事情的领导或他人说明情况,导致工作失误,责任由机电工承担,并处100元以下罚款。
公司设备管理部门如检查发现停用的机械设备没及时保养入库,任其日晒雨淋导致上锈或报废的,处100元以下罚款。
公司设备管理部门如发现有待维修的机械设备没及时维修好就调到另一个工地,导致工程进度受影响,处机电工20元/次罚款。
公司设备主管部门如检查发现塔机使用中,钢丝绳超过报废