汕尾新闻中心综合楼施工组织设计讲解.docx
文本预览下载声明
建筑施工组织课程设计设计名称汕尾市新闻中心综合大楼施工组织设计学院工商管理学院专业班级2011级工程管理4班学号姓名 1000002060 袁鹏生指导教师王学通于茜薇谭湘倩完成日期 2013年12月目录工程概况····················································1施工方案····················································2 2.1主体工程·················································2 2.2起重机械、手脚架·········································22.3土石方工程···············································3 2.4模板工程·················································3 2.5钢筋工程·················································4 2.6砼工程···················································4 2.7现场垂直运输与吊装工程···································5 2.8装饰工程·················································5 2.9屋面工程·················································6 2.10特殊部位的施工方法和技术措施····························6施工进度计划················································6 3.1施工过程的工序项目·······································63.2施工工程量计算填表·······································7 3.3劳动量、各施工过程的作业天数和机械台班数·················7 3.4各工程阶段的流水作业·····································7 3.5编制施工进度计划·········································7 3.6绘制日施工总人数变化折线图·······························7施工平面图···················································8 4.1施工平面图的设计原则·····································8 4.2确定起重机的数量及其位置·································8 4.3砼搅拌站、加工厂、堆放场地的大小与位置···················8 4.4 临时房屋的大小与位置;临时道路和临时水电管网的位置·······8 5.各项技术经济措施·············································8 5.1技术措施·················································8 5.2 质量措施·················································9 5.3 安全措施················································10 5.4 降低成本施工措施········································10 5.5 现场文明施工措施········································111.工程概况本工程为汕尾新闻中心综合楼,位于汕尾市汕尾大道与十二米路交界处。该建筑为五层现浇钢筋砼框架结构,内外墙均为红砖围护墙,平面近似“U”形,局部设有塔楼,最高处为25.10m,总建筑面积为1862m2。本工程采用打入式灌注桩,桩尖为预制,桩管外径为480mm,桩长约12米;采用人工挖土方,不用放坡,沿承台四
显示全部