河北工程大学课程设计 PAGE 18 学 院: 水 电 学 院 专业班级: 姓 名: 学 号: 摘 要 本说明书共七个章节,主要介绍了大江水电站水轮机选型,水轮机运转综合特性曲线的绘制,蜗壳、尾水管的设计方案和工作原理以及调速设备和油压装置的选择。主要内容包括水电站水轮机、排水装置、油压装置所满足的设计方案及控制要求和设计所需求的相关辅助图和设计图。系统的阐明了水电站相关应用设备和辅助设备的设计方案的步骤和图形绘制的方法。 关键词: 水轮机、综合运转特性曲线图、蜗壳、尾水管、调速器、油压装置。 【abstract】 Curriculum project of hydrostation is a important course and practical process in curriculum provision of water-power engineering major . There are seven contents and specialized knowledge in the curriculum project , which make students not to adapt themselves quickly to complete the design . In this paper , characteristic of the curriculum project is analyzed , causes of inadaptation to the curriculum project in students are found , rational guarding method are proposed , and a example of applying the guarding method is given . The results show that using provided method to guard student design is a good method , when teaching mode and time chart are given , students are guarded from mode of thinking and methodology , and design step are discussed and given . After the curriculum project of hydrostation , the capability of students to solve practical engineering problems is improved , and the confidence to engage in design is strengthened . 【Keyword】 Curriculum project of hydrostation ; guarding method ; mode of thinking ; methodology; design step. ? 目 录 第一节 基本资料 ……………………………………………………4 1.1基本资料 1.2设计内容 第二节 机组台数与单机容量的选择 ……………………………………4 2.1 机组台数的选择 2.2 单位容量的选择 第 三 节 水轮机型号、装置方式、转轮直径、转速、及吸出高度与安装高程的确定 ………………………………………………5 3.1 HL240型水轮机 3.2 ZZ440型水轮机 3.3 两种方案的比较分析 第四节 水轮机运转特性曲线的绘制 …………………………11 4.1 基本资料 4.2 等效率曲线的计算与绘制 4.3 出力限制线的绘制 4.4 等吸出高度线的绘制 第五节 蜗壳设计 …………………………………………………………13 5.1 蜗壳型式选择 5.2 主要参数确定 5.3 蜗壳的水力计算及单线图,断面图的绘制 第六节 尾水管设计 ………………………………………………………16 6.1 尾水管型式的选择 6.2 尺寸确定及绘制平面剖面单线图 第七节 调速设备的选择 ………………………………………………17 7.1 调速器的计算 7.2 接力器的选择 7.3 调速器的选择
显示全部
相似文档