物业公共区域及 设施设备接管验收方案 项目名称: 文件编号 版本号 A/0 发布日期 编 制 校 对 审 核 批 准 目 录 成立接管验收小组·································2 接管验收的时间计划·······························3 物业设施设备接管工作流程图·······················4 物业设施设备接管通知·····························5 物业移交资料参考表·······························6 楼层公共部位验收表·······························11 室外公共设施验收表·······························12 消防系统验收表···································13 电梯(直梯)系统验收表····························14 电梯(扶梯)系统验收表····························16 供配电系统验收表·································19 安防系统验收表···································21 二次供水系统验收表·······························22 太阳能热水系统验收表·····························23 中央空调系统验收表·······························24 设施设备验收问题记录表···························26 物业设施设备移交清单·····························27 物业资料移交清单·································28 成立接管验收小组 组 长: 副组长: 下设三个分小组: 1、文件资料接管小组 责任人: 职责:负责接管物业的工程、设备资料的验收移交工作;业户资料的验收移交以及协助楼宇的验收移交工作; 2、现场验收接管小组 责任部门:工程维修部 客户服务部 秩序维护部 环境部 责任人: 职责:负责房屋本体、公共设施和机电设备的验收移交和钥匙接管工作。 3、财务接管小组 责任部门: 责任人: 职责:财务资料的交接。 公共区域及设备设施验收接管计划日期 公共区域及设备设施验收接管计划日期 交接项目 验收日期 整改日期 接管日期 备注(培训日期) 物业设施设备接管工作流程图 物业公司成立接管验收小组 物业公司成立接管验收小组 相关技术人员提出、明确接管验收标准 验收小组初步熟悉相关技术资料 验收小组初步熟悉相关技术资料 有 1、施工图 2、相关使用说明、维修手册等 3、产品合格证、产地证明 施工、调试阶段现场跟进 施工、调试阶段现场跟进 1、学习操作程序、规范 2、记录各种原始参数 3、存在问题及解决方法记录 就接管工作组织专题会议 由建设单位组织,监理公司、承建单 就接管工作组织专题会议 位、物业派代表参加: 明确接管范围 明确各方责任 遗留问题的解决方法 形成会议纪要分发各方 初验,核对数量、逐项检查功能 初验,核对数量、逐项检查功能
显示全部
相似文档