HSE管理体系HSE MANAGEMENT SYSTEM.doc
文本预览下载声明
HSE MANAGEMENT SYSTEM
HSE管理体系
目 录
Table of Contents
1.0 绪论 Foreword 6
1.1 概述 Summary 6
1.2 项目描述 Description of the project 6
1.3 适用范围 Applicable Scope 6
2.0 定义和缩写 DEFINITIONS AND ACRONYMS 6
3.0 领导和承诺 LEADERSHIP AND COMMITMENT 7
3.1 承诺 Commitment 7
3.2 现场指导思想 Site Philosophy 9
4.0 政策和目标 POLICY AND OBJECTIVES 9
4.1 政策 Policy 9
4.2 目标Target 10
5.0 HSE组织机构 HSE Organization 11
6.0 责任、资源、能力及标准 RESPONSIBILITIES, RESOURCES, COMPETENCY AND STANDARDS 13
6.1 项目经理 Project Manager 13
6.2 项目施工经理 Construction Manager 14
6.3 项目HSE经理 HSE Manager 15
6.4 项目主管人员 Project Management Staff 15
6.5 HSE工程师 HSE Engineer 16
6.6 班组长 Group leader 17
6.7 员工 Employee 18
7.0 Implementation and Communication 19
7.1 Main security measures on site 19
7.2 civilized construction and housekeeping 19
7.3 Basic safety measures 20
7.4 Communication 20
8.0 Risk management 21
8.1 HEMP 21
8.2 Job Hazard Analysis (JHA) 22
8.3 Job Safety Analysis (JSA) 23
8.4 Safety Task Analysis Risk Reduction Talk (STARRT) 23
8.5 Lightning. 23
8.6 Typhoon 23
8.7 Poisonous snakes 24
9.0 Ergonomics 24
10.0 Training and Education Plan 24
11.0 Implementation- health 27
11.1 Health goals and targets 27
11.2 Health program 28
11.3 Emergency Response Plan 34
11.4 Emergency Evacuation 36
12.0 Implementation- Safety 37
12.1 Principle and policy 37
12.2 Personal protective equipment and clothing 37
12.3 Fall prevention and protection 43
12.4 Scaffolding 43
12.5 Barricading 49
12.6 Excavation and trenching 50
12.7 Vessels and confined spaces 50
12.8 Equipment refueling plan 51
12.9 Portable ladders- control and inspection 51
12.10 Cranes, material handling and storage 52
12.11 Suspended personnel platforms 53
12.12 Articulating Boom Platform 53
12.13 Mechanical Isolation 53
12.14 Electrical and/or Pneumatic equipment Inspection (ELCB or GFCL) 53
12.15 Wiring and cabling ( underground and overhand electrical installation) 53
12.16 Welding 54
12.17 Guarding 55
12.18 Type of p
显示全部