文档详情

工程造价管理控制论文英文中英文中英文翻译.doc

发布:2018-02-22约1.07万字共6页下载文档
文本预览下载声明
河北农业大学 本科毕业英文文献翻译 题 目 Research on Construction Project Cost Control Management 学 院: 专业班级: 学 号: 学生姓名: 指导教师姓名: 指导教师职称: 年 月 日 英文原文 Engineering Cost Management and Control Even under the WTO and Chinas accession to the world community,Chinas construction industry how to effectively control construction cost of the construction and management of an important component part. However,the current budget for the construction projects - estimate budget,Super budget accounts for the super three is still widespread and that eventually led to a serious loss of control of project investment. Project cost management is the basic contents to determine reasonable and effective control of the project cost. As the project cost to the project runs through the entire process, stage by stage can be divided into Investment Decision stage,the design and implementation phases. The so-called Project Cost effective control is the optimization of the construction plans and design programs on the basis of in the building process at all stages,use of certain methods and measures to reduce the cost of the projects have a reasonable control on the scope and cost of the approved limits. Engineering and cost management work of the current status of project cost management system was formed in the 1950s, 1980s perfect together. Performance of the country and directly involved in the management of economic activities. Provisions in the design stage to different estimates or budget preparation as well as government; Nothing relevant departments to formulate a budget, content, methods and approval, the budget will provide the fixed cost of equipment and materials and fixed price of the budget preparation, approval, management authority,and so on. With the historical process, after recovery, reform and development, formed a relatively complete budget estimate of quota management system. However, as the socialist market economic
显示全部
相似文档