园林景观施工质量措施与方法
摘要:经过多年的发展,我国园林工程建设水平有了长足的进步,但各园林企业发展并不均衡,施工管理水平参差不齐,很多园林工程在施工过程中经常出现停工、窝工等现象,造成了人力物力等资源的严重浪费。此外,对园林工程而言,苗木的质量与栽植过程工艺的控制是对园林工程最终效果影响最大的两个因素,苗木的成活率对园林工程实际景观效果影响极大,若管理存在漏洞,导致苗木大量死亡,往往给带来巨大经济损失与不良社会效应。
关键词:园林景观;科学技术;绿色施工;控制措施
Abstract: after years of development, Chinas landscape engineering construction has made great progress, but the enterprise development is not balanced, construction management level is uneven, a lot of landscape engineering in the construction process of suspension, due to frequent phenomenon, caused the human and material resources such as serious waste. In addition, the garden project, the quality of nursery stock and plant process control of landscape engineering final results of the two most influential factors, the survival rate of seedlings of garden engineering landscape great effect, if the management loopholes, led to the death of a large number of seedlings, often bring huge economic loss and bad social effect.
Key words: landscape architecture; science and technology; green construction; control measures
中图分类号:TV523 文献标识码:A文章编号:
一、园林景观施工的问题
1、人才整体素质较弱
园林工程的建设过程是一个较为复杂和庞大的系统工程,涉及多个领域,学科跨度较大,这个系统将建筑科学、生物科学以及社会科学等与工程技术有机地集成起来,这对园林工程的施工和管理人员提出了更高的要求,需要具备多专业、跨学科知识和艺术修养,但园林景观业作为一个吸纳就业人口的重要行业,一线施工人员大部分为农民工,缺乏相关的专业知识。管理人员方面也在一定程度上存在着这方面的问题,一方面施工管理人员,缺乏生物科学方面的知识,另一方面园林专业方面的人员,却又缺乏建筑施工方面的知识。知识方面的不完整导致了园林工程施工过程中对出现的问题往往缺乏完整的认识,导致技术???理方面出现各种各样的问题。
2、项目各方缺乏有效的沟通
在园林工程建设过程中,由于工程本身复杂性以及不确定因素较多的特点,如天气、不可抗力等因素,工程的工期与成本都可能会有一定程度的延长和增加。此外,园林工程的规划设计与工程实际也可能存在着一定的差别,这些不相符的地方往往会给施工单位带来不少困难,有时还要对园林工程的树种、工程量以及种植方式等指标进行调整,这些都是十分正常的现象,但需要施工方与业主、设计、监理方进行有效的沟通和交流,避免业主误认为这是施工方为了取得更高的利润而有意为之,从而出现管理方面的冲突,最后导致工程质量、进度以及成本等都受到严重的影响。
3、施工管理不完善
经过多年的发展,我国园林工程建设水平有了长足的进步,但各园林企业发展并不均衡,施工管理水平参差不齐,很多园林工程在施工过程中经常出现停工、窝工等现象,造成了人力物力等资源的严重浪费。此外,对园林工程而言,苗木的质量与栽植过程工艺的控是对园林工程最终效果影响最大的两个因素,苗木的成活率对园林工程的成本与的实际景观效果影响极大,若管理存在漏洞,导致苗木大量死亡,往往会带来巨大经济损失与不良社会效应。
二、园林工程的技术管理要点
1、施工前技术准备
根据建设单位提供的施工图纸和场地资料,组织有关人员熟悉图纸,提出问题,参加建