The Performance Prediction of A TBM in Difficult
Ground Condition
Nuh BİLGİN, Cemal BALCI, Hakan TUNÇDEMİR, Şinasi ESKİKAYA
Department of Mining Engineering, Technical University of İstanbul, Turkey.
Mustafa AKGÜL, Melih ALGAN
STFA Construction Company, Turkey.
ABSTRACT: Tuzla-Dragos Sewerage Tunnel is situated in the Asian Side of Istanbul. A
detailed laboratory full-scale cutting tests were used on rock samples collected from tunnel
side. The equipment used for the tests is developed under NATO TU-Excavation Project in
Istanbul Technical University, Mining Engineering Department. Test results were used to
predict the cutting performance of a TBM. Actual and predicted values are later compared
using a rating system for machine utilization.
RÉSUMÉ :Le tunnel Tuzla-Dragos construit pour le reject d’eau pollué est situé au coté
l’Anatolie de la Turquie. Pour réaliser les essais on a développé un équipements dans
l’Université Technique d’Istanbul à la Faculté des Mines à l’aide du financement obtenu par
le project d’excavation NATO-TU. On a profité des résultats des essais pour la suggestion de
la performance d’excavation TBM. En comparant les mesures en place avec certaines
suppositions, on a fait des critiques sur la validité du module
1 INTRODUCTION
Prediction of a TBM (Full Face Tunnel Boring Machine) performance plays an important
factor in decision making for a tunnel contractor. There are several factors which govern the
performance of a TBM. These are mainly rock mass properties, geological conditions,
machine parameters, machine maintenance facilities, experience of contractors and TBM
operator. Several prediction models were used in the past to