文档详情

中国建筑施工网论坛--旋扩珠盘桩旋工方案(Chinese Construction Forum - construction scheme of rotated plate pile).doc

发布:2017-07-20约1.47万字共13页下载文档
文本预览下载声明
中国建筑施工网论坛--旋扩珠盘桩旋工方案(Chinese Construction Forum - construction scheme of rotated plate pile) There are three kinds of people China Construction Forum - rotated plate pile construction scheme of.Txt in the world: one is the conscience of the dog ate, two is the conscience is not the dog person, three is the conscience of even the dogs will not eat people. ), love is a dream, but I overslept Rotary plate pile construction scheme Rotary plate pile construction scheme (1) construction sequence The preparation of construction, positioning, pile hole positioning, spiral drilling, pile hole, rotary disc, self expanding pile, pile hole cleaning and self inspection of foundation subsoil, covert acceptance, reinforcement cage placed, pouring concrete and concrete curing, pile testing, acceptance. (two) construction method 1 、 construction preparation and positioning release: inspect the construction site, site layout. Coordinate with the concerned units, complete the work of three links and one leveling, carry out the positioning and laying out of the building, and make a survey and review of the visa record. Construction materials, and prepare materials, re inspection and other preparatory work with a test. The original hardening floor shall be arranged by the owner of the project to get rid of it. 2, spiral drilling hole (1) measuring the pile hole and setting out the line, and the hole can be made before the test is correct. (2) the hole operator shall control the hole size according to the design elevation and the hole depth. After the auger is drilled, it will be checked and accepted in time. (3) the displacement of the pile hole shall not exceed the relevant regulations: the allowable deviation of the center line of the pile foundation is 70mm, the allowable deviation of the verticality is 1%, the allowable deviation of the diameter of the pile hole is -20mm, and the depth of the pile meets the design requirements. (4) the cover plate of the orifice so as not to fall in
显示全部
相似文档