呼和浩特市铃兰女子学校教职工宿舍施工组织作业.doc
文本预览下载声明
呼和浩特市铃兰女子学校教职工宿舍
施
工
组
织
设
计
编制团队:三组所有成员
编制成员:丁 昊、申 宁、付红波、杜云峰
王 超、师 飞、邢志慧、曹华山
编制时间:2013年06月03日
目 录
前言···········································1
第一节 前言··········································1
第二节 编制依据······································1
第三节 编制原则······································2第四节 本工程采用的技术规范···························3
第五节 参考文献······································4
工程概况········································5
第一节 总体施工目标··································5
第二节 工程施工构想··································5
第三节 建筑概况······································7
第三章 施工部署·······································10
第一节 施工总体部署··································10
第二节 主要分部分项工程施工方法及技术措施·············11
1 测量放线······································11
2 地基和基础工程································12
3 主体工程·····································14
4 装饰工程·····································22
5 地面工程·····································23
6 屋面工程·····································24
7 门窗工程······································26
8 管道工程······································30
9 电气安装······································33
10 建筑节能工程··································36
第四章 施工技术采用新技术、新工艺······················38
第五章 保证质量措施及控制点···························39第六章 保证工期的措施································45第七章 降低成本技术措施······························47第八章 风季、雨季施工的技术措施······················49
第一节 风季施工技术措施·····························49
第二节 雨季施工技术措施·····························50
文明施工、环境保护措施························54
第一节 文明施工措施································54
第二节 环境保护施工措施····························55第十章 安全生产措施·································60
成品保护措施·······························63第十二章 竣工后保修期限承诺及售后服务措施············67
第十三章 附图表······································69
前 言
1、本施工组织设计严格按照工程施工图
显示全部