中央分隔带排水(纵向及横向排水管)施工方案讲解.pdf
中央分隔带排水(纵向及横向排水管)施工方案讲解--第1页
浙江正方交通建设有限公司机西高速公路JXZT-1标段排水工程施工方案
目录
一、编制依据············································································2·
二、工程概况············································································2·
三、施工方法和工作程序·····························································2·
1.中央分隔带········································································2·
2.横向排水管施工工艺流程······················································3·
3.纵向排水沟施工工艺流程······················································7·
4.纵向集水槽施工工艺流程······················································11
四、资源配置计划······································································12
1、人员安排·········································································12
2、材料要求·········································································12
3、施工机械·········································································15
五、质量保证措施······································································15
1、成立质量管理组织机构·······················································15
2、建立健全质量保证体系·······················································16
3、确保工程质量的措施··························································17
六、安全保证措施······································································19
七、环境保护措施······································································24
1
中央分隔带排水(纵向及横向排水管)施工方案讲解--第1页
中央分隔带排水(纵向及横向排水管)施工方案讲解--第2页
浙江正方交通建设有限公司机西高速公路JXZT-1标段排水工程施工方案
排水工程施工方案
一、编制依据