路面工程英文版课程设计.docx
文本预览下载声明
Part I Asphalt Pavement Design
1. Project Statement
?A newly-built highway is planned in Northeast China:
— Design speed: 120km/h
—Four-lane two-direction roads
—Subgrade with: 24.5m=4*3.75+2*2.5(Hard shoulder) +2*1.5(soil shoulder)
—Pav’t type: Asphalt pavement
—Design life: 15 years
?Task: using the given conditions design asphalt pav’t structures for different road sections
2. Design data
2.1 Natural Geographical Conditions
?Natural Zone: II2
?Soil Type: clay soils with a medium value of liquid limit
?Embankment: 0.6m of height
?Water table: 1.6m from the roadbed surface
?Climate: Annual Rainfall of 680mm; HT: 26.5C; LT: -34C
?Frost-thaw:
?Max frozen depth of 183cm;
?Frozen index of 1623C on average and 2140C in Max
2.2 Traffic Analysis
2.2.1 Axle load spectrum
Traffic Composition (Table 1)
Vehicle Type
1s+1d
1s+2d
1s+1d~2d
1s+2d~2d
1s+1d~3d
1s+2d~3d
Traffic Volume
150
250
350
250
60
50
Load Spectrum of Single Axle (Table 2)
Axle Load
20
30
40
50
60
70
80
90
100
Single tire
3.18%
10.56%
15.74%
37.35%
26.34%
4.68%
1.47%
0.68%
0.00%
Duel tires
0.00%
3.75%
9.52%
9.98%
10.84%
4.03%
5.95%
4.58%
2.35%
Axle Load
110
120
130
140
150
160
170
180
Single tire
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Duel tires
7.53%
4.35%
8.23%
5.85%
4.35%
7.21%
7.85%
3.81%
Load Spectrum of Tandem Axles (Table 3)
Axle Load
40
60
80
100
120
140
160
180
200
220
240
1s+2d
3.60%
7.30%
14.40%
18.00%
3.60%
7.30%
8.00%
10.90%
16.00%
10.90%
0.00%
1s+1d~2d
1.60%
5.30%
12.40%
16.00%
3.44%
6.70%
6.00%
7.43%
14.00%
8.90%
2.31%
1s+2d~2d
0.63%
0.90%
2.00%
1.38%
3.51%
5.97%
5.50%
7.21%
4.61%
3.74%
10.90%
1s+2d~3d
0.00%
0.00%
0.50%
2.34%
0.80%
6.96%
5.24%
7.66%
12.10%
18.60%
5.91%
Axle Load
260
280
300
320
340
360
380
400
420
440
1s+2d
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1s+1d~2d
4.35%
4.67%
2.74%
4.16%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1s+2d~2d
4.49%
8.08%
6.21%
7.74%
4.67%
5.12%
10.74%
3.21%
2.15%
1.24%
1s+2d~3d
3.10%
10.25%
4.78%
1.22%
1.65%
2.26%
显示全部