文档详情

T构转体施工工艺框图.doc

发布:2017-05-05约1.51千字共1页下载文档
文本预览下载声明
T-structure turning construction technology Frame Reaching design requirement concrete strength reaching over 85%than design value concrete strength reaching over 85%than design value Foundation 1st fioor concrering Welding foundation steel,preserved piersted of pier Installing sub-table sted platestedaxle axle Foundation top concreting supporting colunn Sub-circle way sand Mortar leveling Sub-table sted plate painting Grease fluorine powder Upper table insert fluorine mushroom end ,painting grease Hoisting upper table sted plate to proper place Erecting form concreting upper tabletemporary support Concreting pier Erecting form concreting beam Section No.0.1.1’ Tensioning beam Section No.0,11’ Removing Supports Concreting symmtrey beam section from2(2ˊ)to10(10ˊ),lapping supports to concrete from 12(12ˊ)to15(15ˊ) Removing temporary Support on turntable Turning body Sealing Table Welding connection section 11(11ˊ)skeleton tension Connection section concreting Bottom Plate Vertical Prestress tension Concreting sealing Removing Temporary strand Connection Section tension Removing supports of Cast-in-place section Erecting border span T-beam Bridge pavement
显示全部
相似文档