T构转体施工工艺框图.doc
文本预览下载声明
T-structure turning construction technology Frame
Reaching design
requirement
concrete strength reaching
over 85%than design value
concrete strength reaching
over 85%than design value
Foundation 1st fioor
concrering
Welding foundation steel,preserved
piersted of pier
Installing sub-table sted
platestedaxle axle
Foundation top concreting
supporting colunn
Sub-circle way sand
Mortar leveling
Sub-table sted plate painting
Grease fluorine powder
Upper table insert fluorine mushroom end ,painting grease
Hoisting upper table sted
plate to proper place
Erecting form concreting upper tabletemporary support
Concreting pier
Erecting form concreting beam
Section No.0.1.1’
Tensioning beam Section No.0,11’
Removing Supports
Concreting symmtrey beam section from2(2ˊ)to10(10ˊ),lapping supports to concrete from 12(12ˊ)to15(15ˊ)
Removing temporary Support on turntable
Turning body
Sealing Table
Welding connection section 11(11ˊ)skeleton
tension
Connection section
concreting
Bottom Plate Vertical Prestress tension
Concreting sealing
Removing
Temporary strand
Connection
Section tension
Removing supports of
Cast-in-place section
Erecting border span
T-beam
Bridge pavement