压力管道设计设计人员考试卷2006(Pressure piping design and design personnel examination volume 2006).doc
文本预览下载声明
压力管道设计设计人员考试卷2006(Pressure piping design and design personnel examination volume 2006)
The design of pressure piping design personnel examination 2006.txt you cant change others, but you can change yourself; you cant change the weather, but you can change the mood; you cant change the length of life, but you can expand the width of it. This article is contributed by rgsmdqy
Pdf documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
In 2006, the pressure piping designers checked the papers
Full name:
Company:
Grade:
I. judgment questions (1 points per subject, 20 points each)
1., fire furnace, auxiliary fuel gas tank, fuel gas heater and furnace body P7, 3.7.7) (x) fire spacing shall not be less than 7.5m. (SH3011 2.
The combustible liquid pump with operating temperature equal to or higher than the autoignition point shall be centrally arranged and operated
A fire-resistant liquid pump with a temperature below the autoignition point shall have a fire interval of not less than 7.5m; there shall be a 4.5m fire interval between the liquid and the LPG pump. (SH3011, 3., P8, 3.10.12) (x)
The tower and vertical containers arranged along the main corridor, such as the top of the corridor without equipment, can be distributed
Located on both sides of the main corridor; if there is equipment above the main corridor, the site or passageway of the equipment above the corridor shall be reserved on the side of the main corridor. (SH3011 4. P4 3.2.3) (V)
Platforms and ladders shall be provided where operations are required and regular maintenance shall be maintained. Press P12.4.3.1 (SH3011) (*)
Safety ladder is required. Five
Transmission medium has special requirements and the straight pipe 2.0.11 on the distance and angle of elevation, etc.) (V)
The layout of the piping shall be in accordance with the requirements of the equipment layout. (H3012 P2 6.
The buried depth of buried pipeline
显示全部