文档详情

营业线施工安全管理培训考试题(带答案)(Construction safety management training examination questions (with answers)).doc

发布:2017-08-15约1.2万字共10页下载文档
文本预览下载声明
营业线施工安全管理培训考试题(带答案)(Construction safety management training examination questions (with answers)) Construction safety management training examination questions (with answers) (1) fill in the 20 questions, each with 2 points, 40 points 1, the construction of business lines refers to the impact of business lines, equipment stability, the use of equipment and driving safety of various construction. 2, the construction leader should have the necessary construction safety quality. The construction project manager, deputy manager, security, technology and quality of the main person in charge must be approved by the Ministry of Railways (or railway bureau) business line construction safety training, is not allowed without the training or training of qualified personnel as the work. The construction of 3. business lines must ensure traffic safety in the first place, adhere to the safety first, prevention first principle. 4., the construction of business lines must adhere to the principles of transportation and construction. 5., the need to work in my bureau on the line of construction outside the construction unit, must obtain the business line construction permit, did not obtain construction permit, not allowed to start. 6. skylight refers to the train map not to plan the train line, or adjust, pumping and reducing the train running line for the business line construction work and maintenance work and stay time. 7, not included in the monthly construction plan temporary interval loading and unloading road materials, the relevant business office two days ahead of schedule to the scheduling plan, by the dispatcher responsible for coordination arrangements. 8, the busy trunk and trunk blockade for more than 5 hours, the impact of letter union closed more than 8 hours for the first class construction. 9, busy trunk line blocked more than 3 hours, the station (the letter) of closed construction for more than 4 hours; trunk line blockade for more than 4 hours, the station (the l
显示全部
相似文档