N23LECQ3CM011房建工程施工方案.doc
文本预览下载声明
Contents
目录
Project overview
工程概况.........................................................1-3
Fabrication reference
编制依据.........................................................3-3
Construction principle
三、施工准备.........................................................3-3
Housing construction engineering construction process
四、房建工程施工流程..............................................4-9
Housing construction engineering process and construction methods
五、房建工程施工工艺及施工方法...........................................9-13
Safety attentions
六、安全注意事项....................................................16-16
一、Project Overview工程概况
This project is Linde Huayi(Chongqing) Gases Co., Ltd 1 Billion Nm3/year Syngas CO/H2 project, located in Chongqing(Changshou) Chemical Industry Park, and the main work contains substation、office、parts stock、compression unit 、power absorption unit、washing unit、raw material gas compressor unit 、high temperature shift unit etc..
本项目为林德化医(重庆)气体有限公司10 亿Nm3/年合成气制备CO/H2 项目,位于重庆(长寿)化工园区内, 其中主体工作包括变电所、办公楼、备件仓库、压缩单元、变电吸附单元、洗涤单元、原料气压缩单元、高温变换单元等。
This project covers complex building, spare parts store, substation works; the complex building and substation are of concrete framework structure and with three floors, building height of complex building is 11.5m, the height of substation is 13.8m, spare parts store is made of reinforced concrete posts and light steel frame, single floor, the height of floor is 6.3m. Because the construction room is very narrow: adjacent to the works there is no available site space, only narrow and long zone can be used as temporary material transfer site, the difficulty during construction will be great. In order to ensure the construction safety、quality、 high efficiency and especially the preparation of the scheme.
本工程房建项目包括综合楼、备件仓库和变电所工程,施工场地狭小:工程邻近无可利用的场地,可供利用的场地很少,仅狭小的区域能利用作为临时中转材料的场地Fabrication reference编制依据
设计图文件地基勘察报告’s groundsill and foundation construction acceptance code》
《建筑地基与基础施工及验收
显示全部