路基边坡重力式挡土墙施工技术
班 级:
姓 名: 学号:
指导教师: 职称:
完成期限: 2014年3月3日— 6月3 日
路基边坡重力式挡土墙施工技术工程往往由于高度,防护不及时,天气边坡滑塌严重,困难在这种情况下我们经常需要重力式来进行。较大,结构简单,相对低,施工方便边坡治理中广泛的使用但是以来人们在挡土墙理论设计和存在很多问题,没有对边坡治理。对边坡防护挡土墙的设计,施工技术及质量控制进行讨论。设计 技术要求Embankment slope gravity retaining wall construction technology
Zhang xiangfeng
Modern highway slope protection works often due to the large slope height, protection is not timely, a little bad weather, and other factors caused a serious slump slope instability, governance difficulties. In this case, we often need to do to govern gravity retaining wall on the slope. Gravity retaining wall larger, simple structure, technical requirements are relatively low, easy construction, it has been widely used in the slope of governance, but has long been a lot of problems in the theory of design and construction of retaining walls, Retaining walls do not make the final slope play an effective role in governance. Therefore, this article on the slope protection gravity retaining wall design, checking, construction technology and quality control are discussed.
key words: Retaining wall Gravity retaining wall design Technical Requirements
Construction Quality Control
目录
第一章、挡土墙的概述 1
1.1 挡土墙的概念及作用 1
1.2 挡土墙的分类 1
使用条件……………………………………………..2第二章、重力式挡土墙的设计内容 4
2.1 重力式挡土墙的概述 4
2.2 重力式挡土墙的位置、形状及截面尺寸 4
挡墙的基础………………………………………….72.4 重力式挡土墙的排水及防水措施 8
2.5 伸缩缝、沉降缝 9
第三章、重力式挡土墙施工 ……..10
………………………………………………………10
3.2基坑开挖 10
3.3 基底处理 10
3.4隔水层、泄水孔、反滤层 11
3.5伸缩缝、沉降缝 11
3.6模板安装 11
3.7现浇墙身砼 11
3.8 拆模、养护 12
挡土墙…………………………….12
4.1施工注意事项………………………………………124.2质量检验标准…………………………………………………13
总结 15
参考文献………………………………………………………………..16
第一章 挡土墙的概述概念及作用2).路堤墙设置在高填土路提或陡坡路堤的下方,可以防止路堤边坡或路堤沿基底滑动,同时可以收缩路堤坡脚,减少填方数量,减少拆迁和占地面积(图2-5-1b)。3).路肩墙设置在路肩部位,墙顶是路肩的组成部分,其用途与路堤墙相同。它还可以保护临近路线的既有的重要建筑物(图2-5-1c)。沿河路堤,在傍水的一侧设置挡土墙,可以防止水流对路基的冲刷和侵蚀,也是减少压缩河床的有效措施(图2-5-1d)。4).山坡墙设置在路堑或路堤上方,用于支撑山坡上可能坍滑的覆盖层、破碎岩层或山体滑坡(图2-5-1e、图2-5-1f)。
1.2 挡土墙的分类
挡土墙各部分名称如图所示。靠回填