无粘结钢绞线体外预应力加固技术的设计和施工方法 DESIGN AND CONSTRUCTION METHOD OF THE EXTERIOR PRESTRESS REINFORCING TECHNOLOGY OF UNBONDED STEEL CABLE
Xiang Jianfeng
(Zhejiang jianfeng reinforcement engineering Co., LTD, Hangzhou,Zhejiang311112,China)
Abstract: According to the development and extensive application of the prestress reinforcing technology of unbonded steel cable,the author introduces the design and construction method of the high-strength and unbonded steel cable respectively from six aspects on the basis of combining the reinforcement and reconstruction engineering practice, which it would be a reference for engineers who work in relevant design and construction of reinforcement and reconstruction.
Keywords: unboned steel cable;prestress;reinforcement;reconstruction
当设有2根中间撑棍时,应使拉紧螺栓至中间撑棍的距离相等,并将两边拉紧螺栓至支承垫板的距离靠近一些,使
Ф60的45#钢制作,锚具支承处要加工成平面。当柱子砼强度较低时,为了提高园钢销棍承压面砼的局部承压强度,可设置内径与园钢销棍直径相同的钢管垫,垫下部用快硬水泥砂浆或堵漏剂坐浆。
Φ60或Φ50(仅一侧钢绞线为斜向时)厚壁钢管制作,内灌细石砼。此时若梁端抗剪承载能力不足,可采用粘贴U形碳纤维布或粘贴钢板的方法解决。 Ф50或Ф60(当二侧钢绞线均为斜向时)厚壁钢管制作,内灌细石砼。如砼孔洞下部的局部挤压强度不满足要求,可设置内径与钢吊棍相同的钢管垫,用快硬水泥砂浆或堵漏剂坐浆。
如果需要补足支座负弯矩承载力,则中间支座水平段钢绞线的长度按计算确定。此时若梁端截面的抗剪承载能力不足,可采用粘贴U形碳纤维布或粘贴钢板的方法解决。 Ф60的45#钢制作,锚具支承面处要加工成平面。当梁的砼质量较差时,可设置内径与园钢销棍直径相同的钢管垫,用快硬水泥砂浆或堵漏剂坐浆。
施工时端部钢垫板接触面处的砼面必须平整,如果不平整则应用快硬水泥砂浆或堵漏剂找平。 Ф80PVC管对开,内置1:2水泥砂浆,然后将钢绞线包裹在里面,用铅丝绑扎,第二天将PVC管取下。
3 用于拔柱时的设计和施工方法
当要拔除的柱子所承受的轴向荷载不是很大时,可采用“无粘结钢绞线体外预应力加固法”对大梁进行加固,然后将柱子拔除。此时原梁端部的负弯矩承载能力和抗剪承载能力仍存在,但不足部分及跨中的全部正弯矩要由所加的钢绞线承担。这种情况必须采用纵向千斤顶张拉施加预应力。为了确保安全,钢绞线数量不宜少于四根,但也不宜大于八根。如果预应力加固后梁端抗剪承载能力仍不足,可采用粘贴U形碳纤维布或粘贴钢板的方法解决。柱子在预应力张拉以后敲掉。在柱子敲掉以后把所有钢绞线和铁件及两端锚具用C25细石砼包裹。具体做法见图11。