汽车塑料部件PFMEA分析 .xls
文本预览下载声明
PFMEA
Cover
Gravité
HistData10
HistData11
HistData13
HistData14
HistData15
HistData16
HistData17
HistData18
HistData19
HistData2
HistData21
HistData22
HistData23
HistData24
HistData25
HistData26
HistData27
HistData28
HistData29
HistData3
HistData30
HistData31
HistData32
HistData33
HistData34
HistData35
HistData36
HistData37
HistData38
HistData39
HistData4
HistData5
HistData6
HistData7
HistData8
HistData9
Infoga_ny_rad
IPR0
krav_resultat_CV
Update_formula
xxx
客户退货
自检+100%目视检查
visual inspectionLayer audit分层审核
1.Correct bin and inner packing1.正确的包装盒及内材
3.Correct QTY of paint库存数量无误
GP-12 mark
GP-12 标记
POTENTIAL FAILURE MODE AND EFFECT ANALYSIS ( PROCESS FMEA )制程FMEA
PROJECT项目 :
PFMEA NO文件号 :
Part Number 零件号 :
Date of Origin制作日期
Part Name 零件名称:
APPROVED BY审核:
REV. NO变更号
Rev Date变更日期
Process Function
制程功能
Product Characteristics
产品特性
Potential Failure Mode潜在失效模式
Potential Effects) Of Failure
SEV严重度
Class
等级
Potential Cause(s)/ Mechanism(s) Of Failure(潜在的失效原因机理)
OCCUR频度
Current Process Controls Prevention
现行预防方法
Current Process Controls Detection现行探测方法
Detection type探测类型
RPN
Recommended Actions)建议的措施
Responsibility Target Completion Date责任&目标完成日期
Action Results措施结果
Next Process
下一制程
Assembly.
装配
Customer
客户
Vehicle/ Application
车型/应用
Actions Taken方案
Sev
Occ
Det
RPN
A
B
C
10.Receiving Raw Material , paint
原材料,涂料的接收
10 a Raw Material received
原材料的接收
1.Raw material Batch No. as per PO
接收的材料,批号与定单一致
Wrong Material supplied against Invoice. 供应商发错料
Not able to plan for production.
无法按计划生产
Supplier not aware of specification grade
供应商未分清材料与等级
Material specification Grade is provided on PO
订单上注明材料规范与等级
2. Correct packing and Labeling
正确的包装与标签
Torn Bags No or wrong identification on bags.
损坏的包装,没有或错误的标签
Material contamination material mix up 材料污染混料
Transit dam
显示全部