文档详情

 群体互动的形成与转化“民工~市民互动”.doc

发布:2016-12-09约1.36千字共12页下载文档
文本预览下载声明
群体互动的形成与转化:“民工——市民互动”分析 Bridge, service levels and even end on the intersection of rongzhou bridge f. 3.1-5 network saturation and intersection service level (3) the operation of the bridge over the River connecting downtown five bridges, bridge traffic flow at least, morning and evening peak bi-directional flow of 3358pcu/h and 3191pcu/h, respectively. Bridge traffic most of the minjiang River, morning rush hour two-way traffic to 4362pcu/h, the evening rush hour Bridge, service levels and even end on the intersection of rongzhou bridge f. 3.1-5 network saturation and intersection service level (3) the operation of the bridge over the River connecting downtown five bridges, bridge traffic flow at least, morning and evening peak bi-directional flow of 3358pcu/h and 3191pcu/h, respectively. Bridge traffic most of the minjiang River, morning rush hour two-way traffic to 4362pcu/h, the evening rush hourBridge, service levels and even end on the intersection of rongzhou bridge f. 3.1-5 network saturation and intersection service level (3) the operation of the bridge over the River connecting downtown five bridges, bridge traffic flow at least, morning and evening peak bi-directional flow of 3358pcu/h and 3191pcu/h, respectively. Bridge traffic most of the minjiang River, morning rush hour two-way traffic to 4362pcu/h, the evening rush hour
显示全部
相似文档