202211

年月江西建材工程技术与应用

大直径钢筋混凝土管土压平衡顶管施工质量控制

罗堉伟

厦门海沧土地开发有限公司,福建

厦门

361000

要:文中以马銮湾新城新阳大道沿线电力隧道工程为例,根据工期、地下水丰富、市政管道和市政路面沉降要求等情况,确定采

用土压平衡顶管方案,从多方面详细阐述了大直径钢筋混凝土管土压平衡顶管施工质量控制。该顶管方案实现了周边环境沉降量较

小,顶管速度快,取得了良好效果。

关键词:土压平衡;大直径;顶推力;注浆减摩

中图分类号:U414

文献标志码:B

文章编号:1006-2890(2022)11-0239-03

Construction

Quality

Control

of

Earth

Pressure

Balance

Pipe

Jacking

for

Large

Diameter

Reinforced

Concrete

Pipes

Luo

Yuwei

Xiamen

Haicang

Land

Development

Co.

Ltd.,

Xiamen,

Fujian

361000

Abstract:Taking

the

power

tunnel

project

along

Xinyang

Avenue

in

Maluanwan

New

City

as

an

example,

the

earth

pressure

balance

pipe

jacking

scheme

is

determined

according

to

the

construction

period,

abundant

groundwater,

and

settlement

requirements

of

municipal

pipelines

and

municipal

road

surfaces.

The

pipe

jacking

scheme

achieves

smaller

settlement

in

the

surrounding

environment,

fast

pipe

jacking

speed

and

good

construction

effect.

Keywords:Earth

pressure

balance;

Large

diameter;

Jacking

force;

Grouting

to

reduce

friction

1 工程概况表2 施工场地岩土层特征

马銮湾新城新阳大道沿线电力隧道工程位于厦门海沧区

埋藏顺序土层名称分布厚度/m岩土层性质

马銮湾新城南片区,电力隧道总长度为6.37km,起点相接于孚

①素填土0.50~2.20干~稍湿,密实度较差

莲路高压电力隧道,终点相接于马青变110kV进出线工程。污

水工程长度为570m,起点相接于灌新路在建污水管道,终点②淤泥3.60~10.40软塑状,局部混有中砂,具

腐臭味

相接于马銮湾东路污水管道。本工程电力隧道顶管分为5段,

松散~稍密状,泥质含量约

管材为钢筋混凝土管成品管,单节管长为2.5m,混凝土强度为③中砂1.80~7.70

显示全部