大直径钢筋混凝土管土压平衡顶管施工质量控制.pdf
202211
年月江西建材工程技术与应用
大直径钢筋混凝土管土压平衡顶管施工质量控制
罗堉伟
厦门海沧土地开发有限公司,福建
厦门
361000
摘
要:文中以马銮湾新城新阳大道沿线电力隧道工程为例,根据工期、地下水丰富、市政管道和市政路面沉降要求等情况,确定采
用土压平衡顶管方案,从多方面详细阐述了大直径钢筋混凝土管土压平衡顶管施工质量控制。该顶管方案实现了周边环境沉降量较
小,顶管速度快,取得了良好效果。
关键词:土压平衡;大直径;顶推力;注浆减摩
中图分类号:U414
文献标志码:B
文章编号:1006-2890(2022)11-0239-03
Construction
Quality
Control
of
Earth
Pressure
Balance
Pipe
Jacking
for
Large
Diameter
Reinforced
Concrete
Pipes
Luo
Yuwei
Xiamen
Haicang
Land
Development
Co.
Ltd.,
Xiamen,
Fujian
361000
Abstract:Taking
the
power
tunnel
project
along
Xinyang
Avenue
in
Maluanwan
New
City
as
an
example,
the
earth
pressure
balance
pipe
jacking
scheme
is
determined
according
to
the
construction
period,
abundant
groundwater,
and
settlement
requirements
of
municipal
pipelines
and
municipal
road
surfaces.
The
pipe
jacking
scheme
achieves
smaller
settlement
in
the
surrounding
environment,
fast
pipe
jacking
speed
and
good
construction
effect.
Keywords:Earth
pressure
balance;
Large
diameter;
Jacking
force;
Grouting
to
reduce
friction
1 工程概况表2 施工场地岩土层特征
马銮湾新城新阳大道沿线电力隧道工程位于厦门海沧区
埋藏顺序土层名称分布厚度/m岩土层性质
马銮湾新城南片区,电力隧道总长度为6.37km,起点相接于孚
①素填土0.50~2.20干~稍湿,密实度较差
莲路高压电力隧道,终点相接于马青变110kV进出线工程。污
水工程长度为570m,起点相接于灌新路在建污水管道,终点②淤泥3.60~10.40软塑状,局部混有中砂,具
腐臭味
相接于马銮湾东路污水管道。本工程电力隧道顶管分为5段,
松散~稍密状,泥质含量约
管材为钢筋混凝土管成品管,单节管长为2.5m,混凝土强度为③中砂1.80~7.70