江县荔枝文化广场园林景观施工组织设计
目 录
第 1 章: 施工组织设计编制依据···················( 1)
1.1 质量检验评定标准······················( 1)
1.2 国家及地区相关施工及验收规范················( 1)
1.3 施工组织设计编制原则····················( 1)
第 2 章: 工程概况·························( 1)
2.1 工程简介··························( 3)
2.2 施工范围 ························( 3)
第 3 章: 施工组织及总体布署····················( 4)
3.1 施工组织及结构·······················( 4)
3.1.1 工程管理模式·····················( 5)
3.1.2 项目部指挥及协调运作·················( 5)
3.2 总体目标··························( 6)
3.2.1 质量目标·······················( 6)
3.2.2 安全目标·······················( 6)
3.2.3 工期目标·······················( 6)
3.2.4 环境目标·······················( 6)
3.3 总体施工组织························( 6)
3.3.1 施进度程安排·····················( 6)
3.3.2 总工期控制方法····················( 6)
3.4 施工协调··························( 7)
3.5 施工准备、人力资源 ·····················( 7)
3.4.1 技术准备·······················( 7)
3.4.2 现场施工准备·····················( 7)
3.4.3 施工工序安排·····················( 7)
3.4.4 需建设单位支持、配合施工问题·············( 8)
第 4 章: 施工总平面规划······················(10)
4.1 临时工程的施工安排··················· ·(10)
4.1.1 临时驻地、临时设施··················(10)
4.1.2 施工用电·······················(10)
4.1.3 施工用水·······················(11)
4.1.4 施工通讯·······················(11)
第 5章: 主要施工方法 ·······················(12)
5.1 施工准备··························(12)
5.1.1 技术准备·······················(12)5.1.2 现场准备工作·····················(12)
5.1.3 人员组织 ······················(12)
5.1.4 材料组织·······················(12)
5.2 施工方案··························(13)
5.2.1 绿化种植工程·····················(13)
5.2.2 场地平整、开挖、浇筑、安砌及硬质铺装工程········(18)
5.2.3 给水管道安装·····················(23)
5.2.4 排水管道安装·····················(25)
5.2.5 电气工程安装·····················(25)
5.2.6 绿化养护措施·····················(28)
第 6 章: 施工保证措施·······················(32)·····················(32)
6.1.1 工期保证实施原则···················(32)
6.1.2 工期保证实施措施···················(32)
6.1.3 确保控制工程按期完成的措施··············(32)
6.2 组织保证措施········