建设程序(Construction procedure)
The best answer to A project management contract signed
B project management approach
C engineering design
C/01 program design
The preliminary design of C/02
For the preliminary design of C/03
C/04 construction design
C/04.01 construction design
C/04.02 construction drawing review
C/04.03 delivery of drawings
Project planning procedures for D
D/01 application design review notice
D/02 special approval (air defense, fire protection, traffic, landscape)
D/03 plans to start the official annual plan
D/04 apply for construction project planning permit
E for the project construction permit
E/01 started to receive approval form
E/02 signed the municipal facilities
E/03 do receive the application form
E/04 tender for the examination and approval formalities
E/05 general contracting operation
Preparation and approval of E/05.01 prequalification documents, bidding documents
E/05.02 tender will be prepared
E/05.03 bidding documents
E/05.04 scene
The preparation of tender documents and submit E/05.05
E/05.06 opening
E/05.07 tender reply, prepare the bid evaluation report
E/05.08 calibration, the bid winning notice
E/05.09 agreed and signed the contract
E/05.10 total contract for the record
E/06 supervision contract operation
E/06.01 bidding qualification
E/06.02 bidding documents
E/06.03 scene
The preparation of tender documents and submit E/06.04
E/06.05 issuing
E/06.06, preparation of tender units defense evaluation report
E/06.07 calibration, the bid winning notice
E/06.08 supervision contract signed
Supervision contract for E/06.09
E/07 implementation of the supervision contract
The E/07.01 project supervision outline review
The performance evaluation process of E/07.02 project implementation supervision
E/07.02.01 project schedule control
Quality control of E/07.02.02 project
Cost control of E/07.02.03 project
E/07.02.04 engineering change and cost claims and price adjustment management
E/07.02.05 construction risk prevention and management