城建学院本科毕业设计(论文)35KV10KV无人值班降压变电站的设计(可编辑).doc
文本预览下载声明
城建学院本科毕业设计(论文)35KV10KV无人值班降压变电站的设计
Abstract
With the development of our industry, all industries increasing demand for power system reliability and stability. The substation is connected to the intermediate links of the power system to bring together the power, lift voltage and distribution of electric energy. The safe operation of the substation power system is critical. In this paper, the design of the step-down substation 35KV/10KV unattended.
The 35kV substation integrated automation system for unattended, its design should be subject to the overall design of the power grid dispatch automation, configuration, features include layout of the equipment shall meet the power grid safety, quality, economy of operation and information layered transmission, sharing of resources principle. Therefore, the design we will use this as the design guidelines to expand the design work.
The entire design process including the choice of design and selection of the main wiring of the electrical substation, short-circuit current calculation, the main transformer and electrical equipment. Which the choice of the electrical equipment including: circuit breakers, isolating switches, current transformers, voltage transformers, bus conductors, surge arresters, high voltage fuses, etcThe simple design of integrated automation equipment unattended substation.
Keywords: step-down substations,electrical part of the design,unattended,integrated automation
目录
摘 要 I
Abstract II
1 绪 论 1
1.1 原始资料 1
1.2 课题的目的和意义 1
1.2.1 提高了运行可靠 2
1.2.2 加快了事故处理的速度 2
1.2.3 提高了劳动生产率 2
1.2.4 降低了建设成本 2
1.3 国内外无人变电站综述 3
1.4 无人值班变电站设计应注意的问题 3
1.4.1 变电站自动化系统的设计原则 3
1.4.2 主接线和平面布置 4
1.4.3 一次设备选型 4
1.4.4 直流系统 4
1.4.5系统的抗干扰能力和自诊断功能 4
1.4.6继电保护的配置 4
2 35KV总降压变电所设计 6
2.1 设计指导思想 6
2.2 主接线的选择 7
2.2.1 电气主接线的含义和满足的要求 7
2.2.2 本设计所选择的主接线方案及其选择理由 7
2.3 主变压器的选择 8
2.3.1 主变压器台数的选择 8
2.3.2 主变容量的确定 9
2.3.3 主变压器接线形式的选择 10
2.3.4 结论 11
2.4 所用变压器的选择和所用电的设计 11
2.5 短路电流的计算 12
2.5.1 概述 12
2.5.2 短路计算的目的 13
2.5.3 短路电流实用计算的基本假设
显示全部