文档详情

建筑工程混凝土冬季施工技术分析及应用.pdf

发布:2019-07-02约9.15千字共2页下载文档
文本预览下载声明
建筑工程混凝土冬季施工技术分析及应用 Technical Analysis and Pracitce of Concrete Construction in Winter 范演垒 (蚌埠铁建实业有限公司,安徽 蚌埠 233000) 摘 要:文章给出保证混凝土冬季施工控制质量措施以及管理措施。通过实例,详细分析了混凝土冬季施工的主要措施。结果表明,严格控制混凝 土拌和时间和坍落度,降低配合比中的用水量,可以避免混凝土产生早期冻害;应尽量缩短运输时间和距离,加快浇筑速度,防止热量散失过多; 应采取相应的保温保湿措施,以利于混凝土强度发展。 关键词:混凝土;冬季施工;质量控制;实例分析 中图分类号: 文献标识码: 文章编号: TU755.9 B 1007- 7359(2009)01- 0046- 02 ( ) Fan Yanlei Bengbu Railway Construction Industry Limited Company, Bengbu 233000, China : A bstract The article proposes measures used for quality control and management of concrete construction in winter. Practical measures of concrete construction in winter is analyzed in details. The result indicates that an early freezing injury of the concrete can be prevented by strict controlling of the mixing time and slump of concrete and by reducing water proportion; the transporting time and distance should be shortened and casting speed raised to retain heat and temperature of the premixed concrete; and some measures for the preservation of temperature and moisture should be taken to favor the strengthening of concrete. : ; ; ; Key words concrete construction in winter quality control example analysis 0 前 言 ②混凝土浇筑前,采取该措施保证混凝土良好的和易性并 需现场测温,应保证入模温度不小于 。 混凝土工程冬季施工是指根据当地多年气温资料,室外日 5℃ 平均气温连续 稳定低于 或最低气温连续 稳定在 ③在混凝土浇筑时,尽量加快浇筑速度,防止热量散失过 5d 5℃ 5d - 3℃以下时,混凝土工程即进入冬季施工。在冬季施工中,如何 多,以便利用混凝土的水化热加快混凝土强度的增加。 避免混凝土受冻,保证施工质量具有重要意义。本文较系统地 ④分层进行浇筑时,严格控制混凝土浇筑的连续性,以防 分析了建筑工程混凝土受冻害损伤的主要原因,并据此分析了 止出现冷缝影响工程质量。 施工实践过程中应当采取的抗冻施工措施。
显示全部
相似文档